SR 20 Over Bear Creek Bridge Replacement
Florida Department of Transportation, District Three

Bay County, Florida

This project consisted of replacing an existing bridge culvert with a cast-in-place flat slab bridge and included roadway resurfacing, right-of-way easements, permitting, hydraulic and scour design, and survey. The existing culvert was undersized, and therefore, had significant scour problems. This bridge replacement utilized a temporary bridge detour in order to maintain traffic during construction.