|
![]() |
||
|
|
|
SR
20 Over Bear Creek Bridge Replacement Florida Department of Transportation, District Three Bay County, Florida This project consisted of replacing an existing bridge culvert with a cast-in-place flat slab bridge and included roadway resurfacing, right-of-way easements, permitting, hydraulic and scour design, and survey. The existing culvert was undersized, and therefore, had significant scour problems. This bridge replacement utilized a temporary bridge detour in order to maintain traffic during construction. |