<?xml version="1.0" encoding="UTF-8"?>
	<rss version="2.0"
		xmlns:content="http://purl.org/rss/1.0/modules/content/"
		xmlns:wfw="http://wellformedweb.org/CommentAPI/"
		xmlns:dc="http://purl.org/dc/elements/1.1/"
		xmlns:atom="http://www.w3.org/2005/Atom"
		xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
		>
	<channel>
		<atom:link href="http://drmp.com/drmperspective/?rss=1" rel="self" type="application/rss+xml" />
		<title>#DRMPerspective</title>
		<description>#DRMPerspective</description>
		<link>http://drmp.com/drmperspective/?rss=1</link>
		<sy:updatePeriod>hourly</sy:updatePeriod>
		<sy:updateFrequency>1</sy:updateFrequency>
		
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fdrmp-showcases-innovative-school-planning-solution-at-the-2026-esri-education-summit</guid>
					<title>DRMP Showcases Innovative School Planning Solution at the 2026 ESRI Education Summit </title>
					<pubDate>Thu, 06 Aug 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fdrmp-showcases-innovative-school-planning-solution-at-the-2026-esri-education-summit</link>
					<description></description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;Situated in the Tampa, Fla., region, Hillsborough County Public Schools (HCPS) serves more than 220,000 students across one of the fastest-growing areas in the state. As the seventh largest school district in the country, HCPS experiences the ongoing challenge of balancing current student needs with long-term planning for continued community growth.&lt;/p&gt;&lt;p&gt;Attendance boundaries change as communities grow, new schools open, and districts adjust plans to meet evolving enrollment needs. To make these decisions effectively, district leaders need tools that bring together data, mapping, and analysis to better understand current conditions and evaluate future scenarios.&lt;/p&gt;&lt;p&gt;At the 2026 Esri Education Summit in San Diego, we joined HCPS to share how a GIS-based Growth Management Tool is helping the district address these challenges. During the “Better Decisions for Better Student Outcomes” Lightning Talk session, we presented alongside HCPS’s department manager of Growth Management, Planning, and Siting to demonstrate how the partnership combines district planning expertise with GIS technology to support more strategic decisions about growth planning.&lt;/p&gt;&lt;p&gt;The Esri Education Summit brings together K-12 educators, administrators, and GIS professionals from across North America to explore strategies, best practices, and emerging geospatial technologies that support innovation in education.&lt;/p&gt;&lt;h3&gt;&lt;b&gt;A Modern Approach to School Planning&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;Traditional planning methods often rely on disconnected spreadsheets, static maps, and manual analysis. Through our partnership with HCPS, we developed a Growth Management Tool designed to help district staff better understand enrollment growth, school capacity, boundary planning, and long-term capital investments. Rather than relying on separate systems and manual analysis, the tool brings together data, mapping, analytics, and reporting into one platform, allowing planners to evaluate current conditions and explore potential scenarios.&lt;/p&gt;&lt;p&gt;To address these challenges, DRMP partnered with HCPS to develop a comprehensive Growth Management and School Planning Application using ArcGIS Experience Builder Developer Edition and ArcGIS Enterprise.&lt;/p&gt;&lt;p&gt;The application combines data, mapping, analytics, and reporting into a single interactive platform, allowing planners to make faster, more informed decisions.&lt;/p&gt;&lt;p&gt;Key capabilities include:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Enrollment and capacity analysis&lt;/li&gt;&lt;li&gt;School boundary visualization and scenario planning&lt;/li&gt;&lt;li&gt;Student assignment modeling&lt;/li&gt;&lt;li&gt;Automated stakeholder reporting&lt;/li&gt;&lt;li&gt;Integration with multiple enterprise data sources and Representational State Transfer (REST) services&lt;/li&gt;&lt;li&gt;Address dictionary management for Student Information Systems (SIS)&lt;/li&gt;&lt;li&gt;Interactive dashboards and spatial analytics for district-wide planning&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;By consolidating these workflows into one platform, the application provides district staff with actionable insights while reducing manual processes and improving collaboration across departments.&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Collaboration That Delivers Results&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;A key part of our presentation was highlighting the success of our partnership with HCPS. Combining HCPS&#039;s planning expertise with DRMP&#039;s GIS development capabilities resulted in a solution tailored to the district’s needs.&lt;/p&gt;&lt;p&gt;Rather than displaying data on a map, the application empowers staff to answer critical questions such as:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Which schools are approaching capacity?&lt;/li&gt;&lt;li&gt;How will new residential developments affect enrollment?&lt;/li&gt;&lt;li&gt;What boundary adjustments produce the best outcomes?&lt;/li&gt;&lt;li&gt;Where should future schools be considered?&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;These insights support strategic planning while helping districts provide better educational opportunities for students.&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Where’s My School? &lt;/b&gt;&lt;/h3&gt;&lt;p&gt;One of the most useful applications to the public developed through our partnership with HCPS is the school locator tool, which helps families and students quickly determine their assigned schools and access enrollment information.&lt;/p&gt;&lt;p&gt;Three years ago, our GIS team developed the school locator tool to provide a simple, accessible way for families to find accurate school assignment information. Since its implementation, the tool has consistently served between 700,000 and 1 million users annually, demonstrating its value as a trusted resource for the HCPS community.&lt;/p&gt;&lt;p&gt;The tool combines address information with HCPS school boundary data to provide school assignments for the current and upcoming school years. This capability is especially important as attendance boundaries change due to rezoning, new schools opening, school closures, and continued residential growth.&lt;/p&gt;&lt;p&gt;Designed with the user experience in mind, the school locator tool provides:&lt;/p&gt;&lt;ul&gt;&lt;li&gt;Assigned elementary, middle, and high schools&lt;/li&gt;&lt;li&gt;School addresses and map locations&lt;/li&gt;&lt;li&gt;Phone numbers&lt;/li&gt;&lt;li&gt;Links to school websites&lt;/li&gt;&lt;li&gt;Resources related to enrollment, transportation, and school choice&lt;/li&gt;&lt;/ul&gt;&lt;p&gt;While the experience for families is a simple exercise, the GIS technology behind the tool supports much larger planning efforts within the district. By maintaining accurate address and boundary data, the application helps HCPS improve access to information for the community while supporting its broader growth management and school planning efforts.&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Sharing Innovation with the GIS Community&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;The Esri Education Summit provides a unique opportunity for GIS professionals, educators, and technology leaders to exchange ideas and showcase innovative solutions. Presenting at the conference allowed our team to demonstrate how modern GIS technology can streamline complex planning workflows while supporting transparent, data-driven decision making.&lt;/p&gt;&lt;p&gt;The session generated strong interest from attendees looking to modernize their own school planning processes and illustrated the growing role GIS plays in educational planning across the country.&lt;/p&gt;&lt;p&gt;As school districts continue to navigate rapid growth, changing demographics, and evolving community needs, intelligent GIS solutions will become increasingly important.&lt;/p&gt;&lt;p&gt;DRMP remains committed to developing innovative, scalable applications that help organizations turn data into confident decisions. We are honored to have shared our work at the 2026 Esri Education Summit and look forward to continuing to support educational institutions with GIS solutions that make an impact.&lt;/p&gt;&lt;p&gt;Interested in partnering with us? Click &lt;a href=&quot;https://drmp.com/expertise/geographic-information-systems-gis&quot;&gt;&lt;b&gt;here&lt;/b&gt;&lt;/a&gt;.&lt;/p&gt;&lt;hr&gt;&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;&lt;div class=&quot;col first&quot;&gt;&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/mbrown.jpg?v=1752525913396&quot;&gt;&lt;/h3&gt;&lt;/div&gt;&lt;div class=&quot;col last&quot;&gt;&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/mark-brown-gisp&quot;&gt;Mark Brown, GISP,&lt;/a&gt; serves as a GIS Project Group Leader for DRMP&#039;s Surveying and Mapping/Geospatial Division. &lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;&lt;p&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;hr&gt;&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;&lt;div class=&quot;col first&quot;&gt;&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/ravneetkathuria-min.jpg?v=1752526074445&quot;&gt;&lt;/h3&gt;&lt;/div&gt;&lt;div class=&quot;col last&quot;&gt;&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/ravneet-kathuria&quot;&gt;Ravneet Kathuria&lt;/a&gt; serves as a GIS Analyst for DRMP&#039;s Surveying and Mapping/Geospatial Division.  &lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fthe-engineering-behind-downtown-orlando-s-magnolia-avenue-two-way-conversion</guid>
					<title>The Engineering Behind Downtown Orlando’s Magnolia Avenue Two-Way Conversion</title>
					<pubDate>Mon, 03 Aug 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fthe-engineering-behind-downtown-orlando-s-magnolia-avenue-two-way-conversion</link>
					<description>&lt;p&gt;The Magnolia Avenue Phase 1 Improvements restore two-way traffic along a key downtown Orlando corridor, creating a more connected, accessible, and multimodal street network within the Historic Business District. As the roadway design engineer, DRMP developed innovative solutions that enhance safety, improve access for motorists, pedestrians, cyclists, and transit users, and support the City of Orlando&#039;s long-term vision for a vibrant and economically resilient downtown.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;How many times have you driven through a downtown – big or small – only to find yourself searching for parking, navigating a maze of one-way streets, or circling the block after missing your destination?&lt;/p&gt;

&lt;p&gt;For drivers, one-way street networks can make navigating downtown less intuitive, particularly when accessing businesses, offices, entertainment venues, and public spaces.&lt;/p&gt;

&lt;p&gt;To improve access and connectivity in downtown Orlando, the City of Orlando selected DRMP as the roadway design engineer for Phase 1 to convert Magnolia Avenue, an important corridor within the Historic Business District, from a one-way to a two-way street. The project is part of the City&#039;s $750 million Downtown Orlando (DTO) Action Plan, a long-term initiative to create a more connected, accessible, and vibrant downtown.&amp;nbsp;The project remains under construction but is nearing completion in the coming weeks, with some blocks already completed and open to traffic.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/orlando_magnolia_ave_road_recon_05_edited.jpg?v=1785442949533&quot;&gt;&lt;/p&gt;

&lt;p&gt;&lt;small&gt;&lt;em&gt;Photo credit: Merary Portillo/DRMP&amp;nbsp;&lt;/em&gt;&lt;/small&gt;&lt;/p&gt;

&lt;p&gt;The project extends from South Magnolia Avenue and East South Street to North Magnolia Avenue and East Livingston Street, enhancing a key north-south connection through downtown Orlando. The corridor was originally designed as a two-way street before being converted to one-way traffic in the 1950s as Orlando grew following the construction of Interstate 4 (I-4).&lt;/p&gt;

&lt;p&gt;The first phase of the Magnolia Avenue improvements restores two-way traffic while incorporating roadway, on-street parking, transit, pedestrian, and bicycle enhancements designed to create a safer, more intuitive, and more walkable downtown corridor.&lt;/p&gt;

&lt;h3&gt;&lt;b&gt;Designing for the Downtown of Tomorrow&lt;/b&gt;&lt;/h3&gt;

&lt;p&gt;Returning Magnolia Avenue to a two-way corridor required coordination among multiple agencies, detailed traffic analysis, and engineering solutions that balanced the needs of a busy downtown environment. While the previous configuration efficiently accommodated commuter traffic, DRMP’s updated design creates new opportunities for improved access, multimodal connectivity, and a more inviting corridor for people traveling through the Historic Business District.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/orlando_magnolia_ave_road_recon_06_edited.jpg?v=1785443091465&quot;&gt;&lt;/p&gt;

&lt;p&gt;&lt;small&gt;&lt;em&gt;Photo credit: Merary Portillo/DRMP&lt;/em&gt;&lt;/small&gt;&lt;/p&gt;

&lt;p&gt;Working closely with the City of Orlando, the Florida Department of Transportation (FDOT), and LYNX, Central Florida’s public bus system, DRMP addressed the roadway, traffic, and transit elements needed to deliver improvements throughout the first phase of the corridor transformation.&lt;/p&gt;

&lt;p&gt;In addition to the roadway reconfiguration, the Phase 1 improvements include:&lt;/p&gt;

&lt;ul&gt;
	&lt;li&gt;Incorporating bicycle, pedestrian, and transit improvements throughout the corridor&lt;/li&gt;
	&lt;li&gt;Adding on-street parking to improve access to downtown businesses and destinations&lt;/li&gt;
	&lt;li&gt;Removing existing concrete and landscaped medians and modifying corridor features to support the new roadway configuration&lt;/li&gt;
	&lt;li&gt;Modifying traffic signals at key intersections&lt;/li&gt;
	&lt;li&gt;Installing new signage and pavement markings&lt;/li&gt;
	&lt;li&gt;Milling and resurfacing the corridor&lt;/li&gt;
	&lt;li&gt;Conducting traffic modeling to evaluate operational performance&lt;/li&gt;
	&lt;li&gt;Performing structural analyses of existing traffic mast arms&lt;/li&gt;
&lt;/ul&gt;

&lt;p&gt;The project also includes changes to LYMMO, the bus rapid transit system in downtown Orlando operated by LYNX. As part of the Phase 1 roadway redesign, most dedicated LYMMO bus lanes along Magnolia Avenue will be removed, and bus operations will be incorporated into the general traffic flow as the corridor transitions from a one-way to a two-way roadway. Coordinating these transit changes was an important part of maintaining downtown transit service while implementing the new roadway configuration.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/orlando_magnolia_ave_road_recon_08_edited.jpg?v=1785445382472&quot;&gt;&lt;/p&gt;

&lt;p&gt;&lt;span&gt;&lt;i&gt;Photo credit: Merary Portillo/DRMP&lt;/i&gt;&lt;/span&gt;&lt;/p&gt;

&lt;h3&gt;&lt;b&gt;Downtown’s Next Chapter&lt;/b&gt;&lt;/h3&gt;

&lt;p&gt;The Magnolia Avenue – Phase 1 Improvements represent one of the first major implementation steps of the City’s DTO Action Plan. The plan includes future two-way conversions of Orange and Rosalind avenues, two high-traffic commuter roads.&lt;/p&gt;

&lt;p&gt;These improvements will help create a more cohesive, intuitive street network, strengthen connections between downtown destinations, and improve access as part of the City’s efforts to attract new retail and private investment downtown.&lt;/p&gt;

&lt;p&gt;As downtown Orlando continues to evolve, Magnolia Avenue represents a renewed approach to how streets function, not only as transportation routes, but as connections between the places where people live, work, and gather.&lt;/p&gt;

&lt;p&gt;Check out the photo gallery below to see more photos of the project&#039;s progress.&amp;nbsp;&lt;/p&gt;

						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;div class=&quot;inline-gallery-wrap&quot;&gt;
			&lt;div
				class=&quot;static-page-inline-gallery embedded-gallery&quot;
				style=&quot;&quot;
				data-fx=&quot;fade&quot;
				data-speed=&quot;500&quot;
				data-timeout=&quot;0&quot;
				data-type=&quot;embedded_with_thumbs&quot;
				data-has-fullscreen-mode=&quot;0&quot;
				data-thumb-height=&quot;&quot;
			&gt;
				&lt;div class=&quot;stage&quot;&gt;
					
				
					&lt;div class=&quot;slide placeholder&quot;&gt;
						
							&lt;div class=&quot;image&quot;&gt;&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_02_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 02 Edited&quot; /&gt;&lt;/div&gt;
						
					&lt;/div&gt;
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_02_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 02 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_03_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 03 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_04_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 04 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_07_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 07 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_09_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 09 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_11_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 11 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_10_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 10 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_12_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 12 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img loading=&quot;progressive&quot;  src=&quot;/uploads/application/files/static-gallery/1349279/Orlando_Magnolia_Ave_Road_Recon_13_edited.jpg&quot; alt=&quot;Orlando Magnolia Ave Road Recon 13 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				&lt;/div&gt; &lt;!-- /.stage --&gt;
			&lt;/div&gt; &lt;!-- /.embedded-gallery --&gt;
		&lt;/div&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fbehind-the-drawings-a-cad-designers-30-year-career-in-bridge-design</guid>
					<title>Behind the Drawings: A CAD Designer’s 30-Year Career in Bridge Design</title>
					<pubDate>Sun, 02 Aug 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fbehind-the-drawings-a-cad-designers-30-year-career-in-bridge-design</link>
					<description>&lt;p&gt;In recognition of National CAD Day, DRMP Structures Chief Designer Jim Arnemann reflects on more than 30 years in the industry, sharing how computer-aided design has transformed structural engineering from hand-drafted plans to advanced digital workflows. Through his career, including work on the award-winning A. Max Brewer Bridge, Jim offers insights into the evolution of CAD technology, the importance of collaboration and attention to detail, and why experienced professionals remain essential to delivering safe, high-quality infrastructure.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;When DRMP Structures Chief Designer Jim Arnemann joined DRMP more than 30 years ago, structural drawings were still created by hand on drafting tables. Revisions required an eraser, a steady hand, and a lot of patience. Since then, he has witnessed a significant transformation in the industry – the shift from manual drafting to sophisticated computer-aided design (CAD) software that has revolutionized how infrastructure is planned, designed, and delivered.&lt;/p&gt;

&lt;p&gt;Throughout his career, Arnemann has helped bring countless transportation structures to life, including the award-winning A. Max Brewer Bridge in Titusville, Fla., by turning engineering concepts into detailed construction drawings that make projects possible.&lt;/p&gt;

&lt;p&gt;In recognition of National CAD Day on Aug. 2, Arnemann reflects on more than three decades in the profession, sharing how CAD technology has evolved, the lessons that have stayed with him throughout his career, and why attention to detail remains just as important today as it was when he first started his career.&lt;/p&gt;

&lt;div class=&quot;q-and-a&quot;&gt;
&lt;div class=&quot;question&quot;&gt;&lt;b&gt;&lt;b&gt;What interested you in CAD, and why did you choose this line of work&lt;/b&gt;?&lt;/b&gt;&lt;/div&gt;

&lt;div class=&quot;answer&quot;&gt;
&lt;p&gt;I&#039;ve always enjoyed solving problems and figuring out how things fit together. There’s an art to creating CAD drawings. It’s about understanding how all the pieces come together and presenting the information in a way that engineers, contractors, and field crews can easily understand. A good CAD drawing is accurate, organized, and clearly communicates the design.&lt;/p&gt;

&lt;p&gt;CAD gave me the opportunity to take ideas and turn them into detailed drawings that bring projects to life. I enjoy the challenge of making sure every piece works as part of a larger system and knowing that the work we do on the computer eventually becomes something people use in their daily travels.&lt;/p&gt;
&lt;b&gt;&lt;/b&gt;&lt;/div&gt;
&lt;/div&gt;

&lt;div class=&quot;q-and-a&quot;&gt;
&lt;div class=&quot;question&quot;&gt;&lt;b&gt;&lt;b&gt;You&#039;ve been with DRMP for over 30 years. What&#039;s the biggest change you&#039;ve seen in structural design and CAD technology over your career&lt;/b&gt;?&lt;/b&gt;&lt;/div&gt;

&lt;div class=&quot;answer&quot;&gt;
&lt;p&gt;I’d say the biggest change has been the move from manual drafting to digital design. When I started, everything was done by hand using ink pens, paper, and drafting tables, so making revisions took time and effort. Before CAD, making changes to drawings took a lot more time. Now we can make updates quicker, share information more easily, and work through problems earlier in the process. The biggest difference is the speed and efficiency CAD has brought to the design process.&lt;/p&gt;
&lt;b&gt;&lt;/b&gt;&lt;/div&gt;
&lt;/div&gt;

&lt;div class=&quot;q-and-a&quot;&gt;
&lt;div class=&quot;question&quot;&gt;&lt;b&gt;&lt;b&gt;What&#039;s one project from your career that you&#039;re especially proud of, and why does it stand out&lt;/b&gt;?&lt;/b&gt;&lt;/div&gt;

&lt;div class=&quot;answer&quot;&gt;
&lt;p&gt;The A. Max Brewer Bridge is one of the projects I’m most proud of. It was a large, complex design-build project that replaced an aging swing bridge with a 3,207-foot high-level fixed bridge over the Indian River and Intracoastal Waterway in Titusville. The project also improved access to NASA property and the Canaveral National Seashore.&lt;/p&gt;

&lt;p&gt;What makes this project stand out to me is that it was an important project for the community, but it was also a very complex design. The bridge included several unique elements, including a post-tensioning system, custom pilings, a scenic overlook, and an ADA-accessible fishing pier.&lt;/p&gt;

&lt;p&gt;As part of the CAD team, my role was to take the engineers’ designs and develop the detailed construction drawings that contractors could use to build the project. That meant making sure the plans were accurate, coordinated, and could be built as intended while working closely with the engineers to resolve design challenges throughout the process. The drawings are an important part of communicating the design to engineers, contractors, and field crews, so attention to detail is critical.&lt;/p&gt;

&lt;p&gt;It was also rewarding to be part of a project that not only improved transportation and navigation for the community but also created a visually impressive structure that people can enjoy. This project won multiple state and national engineering awards, and it’s exciting that I was a part of the team in bringing the design to life.&lt;/p&gt;
&lt;b&gt;&lt;/b&gt;&lt;/div&gt;
&lt;/div&gt;

&lt;div class=&quot;q-and-a&quot;&gt;
&lt;div class=&quot;question&quot;&gt;&lt;b&gt;&lt;b&gt;How has collaboration between designers and engineers changed since you first started in the industry?&lt;/b&gt;?&lt;/b&gt;&lt;/div&gt;

&lt;div class=&quot;answer&quot;&gt;
&lt;p&gt;The objective is always to produce the best possible and accurate design, but the way we work together has changed quite a bit. Years ago, collaboration relied heavily on printed drawings, face-to-face meetings, and manual markups. Today, digital tools allow designers and engineers to share files instantly, review revisions in real time, and coordinate much more efficiently. Faster communication helps us identify potential issues earlier in the design process, which leads to better project outcomes and quicker turnaround times.&lt;/p&gt;
&lt;b&gt;&lt;/b&gt;&lt;/div&gt;
&lt;/div&gt;

&lt;p&gt;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;

&lt;p&gt;&lt;b&gt;&lt;b&gt;&lt;/b&gt;&lt;/b&gt;&lt;/p&gt;

&lt;div class=&quot;q-and-a&quot;&gt;
&lt;div class=&quot;question&quot;&gt;&lt;b&gt;&lt;b&gt;&lt;b&gt;&lt;b&gt;What&#039;s one lesson that&#039;s stayed with you throughout your career&lt;/b&gt;?&lt;/b&gt;&lt;/b&gt;&lt;/b&gt;&lt;/div&gt;

&lt;div class=&quot;answer&quot;&gt;
&lt;p&gt;Patience and consistency. Good design takes time, and paying attention to the details is one of the most important parts of the job. A small mistake on a drawing can become a much bigger issue during construction, so it&#039;s important to stay focused, double-check your work, and approach each project with the same level of care, no matter how large or small it is.&lt;/p&gt;
&lt;b&gt;&lt;/b&gt;&lt;/div&gt;
&lt;/div&gt;

&lt;div class=&quot;q-and-a&quot;&gt;
&lt;div class=&quot;question&quot;&gt;&lt;b&gt;&lt;b&gt;&lt;b&gt;&lt;b&gt;What do you think the future holds for CAD and structural design&lt;/b&gt;?&lt;/b&gt;&lt;/b&gt;&lt;/b&gt;&lt;/div&gt;

&lt;div class=&quot;answer&quot;&gt;
&lt;p&gt;I think artificial intelligence will continue to become a bigger part of the design process. It has the potential to automate repetitive tasks, improve efficiency, and help us work faster. Will it take over? I don’t think it will replace experienced CAD professionals. Good design still requires engineering judgment, problem-solving, and an understanding of how structures are built. Safety should always be the No. 1 priority on every project, and we will still need that human set of eyes to review the work and make sure everything is done correctly. AI will be another tool that helps us do our jobs better, but experience and human judgment will continue to play an important role in delivering quality designs.&lt;/p&gt;
&lt;b&gt;&lt;/b&gt;&lt;/div&gt;
&lt;/div&gt;

&lt;div class=&quot;q-and-a&quot;&gt;
&lt;div class=&quot;question&quot;&gt;&lt;b&gt;&lt;b&gt;&lt;b&gt;&lt;b&gt;What&#039;s something most people would be surprised to learn about CAD or the work that CAD professionals do&lt;/b&gt;?&lt;/b&gt;&lt;/b&gt;&lt;/b&gt;&lt;/div&gt;

&lt;div class=&quot;answer&quot;&gt;
&lt;p&gt;A lot of people think CAD is just drawing lines on a computer, but there&#039;s much more to it than that. CAD professionals need to understand how structures go together, interpret engineering concepts, identify potential conflicts, and create drawings that contractors can confidently build from. Construction drawings are the roadmap for a project, so accuracy and attention to detail are paramount.&lt;/p&gt;
&lt;b&gt;&lt;/b&gt;&lt;/div&gt;
&lt;/div&gt;

&lt;hr&gt;
&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;
&lt;div class=&quot;col first&quot;&gt;
&lt;h3&gt;&lt;b&gt;&lt;b&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/jarnemann.jpg?v=1785521050560&quot;&gt;&lt;/b&gt;&lt;/b&gt;&lt;/h3&gt;
&lt;/div&gt;

&lt;div class=&quot;col last&quot;&gt;
&lt;p&gt;&lt;b&gt;&lt;b&gt;&lt;a href=&quot;https://drmp.com/drmperspective/jim-arnemann&quot;&gt;Jim Arnemann&lt;/a&gt; serves as a Structures Chief Designer for DRMP’s Transportation Market Sector.&lt;/b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;

						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fa-major-central-florida-traffic-headache-gets-a-long-term-fix-at-i-4-and-sand-lake-road</guid>
					<title>A Major Central Florida Traffic Headache Gets a Long-Term Fix at I-4 and Sand Lake Road</title>
					<pubDate>Tue, 28 Jul 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fa-major-central-florida-traffic-headache-gets-a-long-term-fix-at-i-4-and-sand-lake-road</link>
					<description>&lt;p&gt;The I-4 at Sand Lake Road Interchange is transforming one of Central Florida&#039;s busiest and most congested interchanges into a modern diverging diamond interchange (DDI), improving safety, mobility, and access to the International Drive Tourism District. Delivered through a collaborative design-build approach, this complex project showcases DRMP&#039;s expertise in innovative transportation design, stakeholder coordination, and cost-effective engineering solutions that enhance traffic operations, improve regional connectivity, and support one of Florida&#039;s most heavily traveled transportation corridors.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;If there was one interchange drivers hoped to avoid, it was I-4 at Sand Lake Road – Central Florida&#039;s busiest interchange and the heart of the Central Florida International Drive Tourism District. Serving as a critical gateway to hotels, attractions, businesses, and surrounding neighborhoods, the interchange experienced long backups that stretched along the exit ramp. Drivers heading toward Turkey Lake Road, Phillips Crossing, and popular destinations such as Whole Foods Market could spend several minutes just getting off I-4 before crossing over multiple lanes of traffic to reach their destination. As traffic volumes continued to grow, the existing configuration could no longer keep pace, making improvements essential to enhancing safety, mobility, and reliability along the I-4 corridor.&lt;/p&gt;&lt;p&gt;As lead designer, DRMP collaborated with The Lane Construction Corporation (contractor) to transform the I-4 at Sand Lake Road interchange as part of the I-4 Beyond the Ultimate program. The $249.7 million Florida Department of Transportation (FDOT) District 5 design-build project is reconstructing the existing interchange into a diverging diamond interchange (DDI), creating a more efficient traffic pattern and a direct connection from westbound I-4 to Turkey Lake Road. With design complete, construction is approximately 70 percent complete, and the project remains on track for completion in early 2028.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/dsc00555-1_edited.jpg?v=1784826121168&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;em&gt;&lt;small&gt;An aerial view of the I-4 at Sand Lake Road Diverging Diamond Interchange (DDI) &lt;/small&gt;&lt;/em&gt;&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Arnold Palmer Invitational Preparation&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;Because the interchange sits at the center of the International Drive Tourism District and provides access to major events such as the Arnold Palmer Invitational, successful project delivery required early coordination with the International Drive Chamber of Commerce and surrounding stakeholders. That coordination led to the team&#039;s innovative interim DDI, which maintained continuous traffic flow while the interchange was actively being reconfigured and allowed the traffic shift to be successfully implemented during the Arnold Palmer Invitational weekend.&lt;/p&gt;&lt;p&gt;The team also worked closely with stakeholders to minimize construction impacts on the area&#039;s businesses, residents, and millions of visitors. Decorative fencing, landscaping elements, and other jobsite screening measures helped maintain a welcoming appearance throughout construction.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/i-4_at_sand_lake_rendering.jpg?v=1784826187889&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;small&gt;&lt;em&gt;Conceptual rendering showing the proposed interchange configuration and bridges &lt;/em&gt;&lt;/small&gt;&lt;/p&gt;&lt;p&gt;DRMP provided roadway, drainage, structures, environmental/permitting, survey, subsurface utility engineering (SUE), geotechnical engineering, traffic signals, intelligent transportation system (ITS) improvements, signing and pavement marking, tolling, lighting, and aesthetic lighting services for the reconstruction of the interchange. The project includes three bridge replacements, three new ramp bridges, two bridge widenings, and a buffered westbound express lane between Sand Lake Road and Central Florida Parkway.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/i-4_at_sand_lake_rendering2.jpg?v=1784830037761&quot;&gt;&lt;em&gt;&lt;/em&gt;&lt;/p&gt;&lt;p&gt;&lt;small&gt;&lt;em&gt;Conceptual rendering showing the diverging diamond interchange &lt;/em&gt;&lt;/small&gt;&lt;/p&gt;&lt;h3&gt;&lt;b&gt;A Major Milestone Opening&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;In May 2026, the project reached a significant milestone with the opening of a new ramp system that improved access between westbound I-4, Sand Lake Road, and Turkey Lake Road while construction continues on the overall interchange improvements. The new loop ramp replaced the previous left-turn movement from westbound Sand Lake Road to southbound Turkey Lake Road, reducing congestion and eliminating a challenging crossing movement through heavy traffic. The updated configuration also provides westbound I-4 motorists with more direct access to either Turkey Lake Road or Sand Lake Road, creating a safer and more efficient connection.&lt;/p&gt;&lt;p&gt;Following award, FDOT District 5 expanded the project&#039;s scope by entrusting the team with the design, permitting, and release-for-construction plans for a new eastbound express lane connection tying into the Moving I-4 Forward (MI-4) Project 4 and I-4 Ultimate improvements. Through close collaboration with FDOT and the design-build team, DRMP successfully incorporated this additional work while maintaining project momentum.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/dsc00577_edited.jpg?v=1784827283448&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;em&gt;&lt;small&gt;Aerial view of the bridge decks spanning the I-4 at Sand Lake Road Interchange&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;&lt;p&gt;The team also developed Alternative Technical Concepts (ATCs) that improved constructability and project value by shifting the I-4 typical section to the west. This innovative approach improved the horizontal and vertical geometry of the mainline and ramps, enabled bridges to be constructed offline, reduced the bridge deck area by more than 18,000 square feet, and eliminated the need for Category 2 bridges, post-tensioned piers, and shoring towers.&lt;/p&gt;&lt;p&gt;The I-4 at Sand Lake Road interchange demonstrates how a collaborative design-build approach can deliver innovative, cost-effective solutions while adapting to evolving project needs. The result is a modern interchange that improves safety, mobility, and long-term performance for one of Central Florida&#039;s most vital transportation corridors and the gateway to one of the state&#039;s premier tourism destinations.&lt;/p&gt;&lt;hr&gt;&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;&lt;div class=&quot;col first&quot;&gt;&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/tlallathin.jpg?v=1784141121835&quot;&gt;&lt;/h3&gt;&lt;/div&gt;&lt;div class=&quot;col last&quot;&gt;&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/tj-lallathin-pe-dbia&quot;&gt;TJ Lallathin, Jr., PE, DBIA, &lt;/a&gt;serves as Executive Vice President of Alternative Delivery. &lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fdrmp-gives-families-a-lift-through-its-charity-bike-build</guid>
					<title>DRMP Gives Families a Lift Through Its Charity Bike Build 2026</title>
					<pubDate>Thu, 23 Jul 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fdrmp-gives-families-a-lift-through-its-charity-bike-build</link>
					<description>&lt;p&gt;DRMP employees took time out of their day to volunteer at the firm&#039;s Orlando, Fla., headquarters for the Charity Bike Build, assembling 50 bicycles for children and teens served by the Howard Phillips Center for Children and Families.&amp;nbsp;Through the DRMPCares program, the event reflects the firm&#039;s commitment to supporting community involvement initiatives that create lasting, positive impacts in STEM education, health, and the lives of children.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;Senior Roadway Engineer Alan King, PE, works part-time and primarily from his home, but when he heard the firm needed extra helping hands for its Charity Bike Build, he didn&#039;t hesitate to step up.&lt;/p&gt;&lt;p&gt;King is just one example of the commitment DRMP employees bring to the firm&#039;s annual Charity Bike Build, which is made possible through the DRMPCares program. The corporate social responsibility initiative provides resources to support community involvement efforts that create positive, lasting change in STEM education, health, and the lives of children.&lt;/p&gt;&lt;p&gt;“I don&#039;t get into the office very often, but the Bike Build looked like something I could help with,” King said. “I like putting things together, though I&#039;d never done bikes. I enjoyed the experience of doing something important, working alongside my fellow employees, and I look forward to doing it again.”&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/ei3a1518_edited_compressed.jpg?v=1784754130327&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;em&gt;&lt;small&gt;Senior Project Engineer Geoff Scales, PE, assembles a bike, while Senior Traffic ITS Designer Domingo Delgado &lt;/small&gt;&lt;/em&gt;&lt;em&gt;&lt;small&gt;and Senior Roadway Engineer Alan King, PE, work behind him.&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;&lt;p&gt;This year&#039;s event brought together dozens of employee volunteers at DRMP&#039;s Orlando, Fla., headquarters to assemble 50 bicycles for local children and teens served by the Howard Phillips Center for Children and Families. Over the course of three Charity Bike Build events, DRMP employees have assembled 150 bikes, along with donated helmets and bike locks for families. Following assembly, several employees performed quality control checks on each bicycle to help ensure the bikes were properly assembled and ready for their new riders.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/ei3a1619_edited-1.jpg?v=1784751804628&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;small&gt;&lt;em&gt;A Howard Phillips Center for Children and Families employee receives a donated bicycle from DRMP staff.&lt;/em&gt;&lt;/small&gt;&lt;/p&gt;&lt;p&gt;The bikes provide a vital means of transportation, helping teens get to after-school activities, sports, jobs, and other opportunities they might otherwise struggle to reach.&lt;/p&gt;&lt;p&gt;The Howard Phillips Center supports children, teens, and their families through a wide range of services, including care for young children with developmental delays and special needs, as well as assistance for those who have experienced abuse or neglect through urgent medical exams, injury documentation, and forensic interviews. The center also provides long-term counseling and operates mobile healthcare units that bring critical medical services directly to schools, ensuring children and teens receive the care, protection, and support they need to thrive.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/ei3a1668_edited.jpg?v=1784751937759&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;em&gt;&lt;small&gt;Howard Phillips Center for Children and Families staff organize DRMP donated bikes for distribution.&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;&lt;p&gt;For Construction Services Administrative Assistant Sabrina Gaynor, this year&#039;s event was one she had been anticipating since joining the firm.&lt;/p&gt;&lt;p&gt;“This was my first time participating in the Bike Build,” she said. “I had just started with the company when the event took place last year, and I was truly inspired by how many employees took time out of their day to come together and support such a meaningful cause. I knew then that I wanted to participate the next time the opportunity came around, and I&#039;m so grateful that I was able to be part of it this year.”&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/dsc_0039-_edited.jpg?v=1784751835534&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;em&gt;&lt;small&gt;Construction Services Administrative Assistant Sabrina Gaynor and Drainage and Water Resources Administrative Assistant Hannah Guglielmello pose with the bike they assembled together.&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;&lt;p&gt;Structures Engineer Warren Allen, PE, returned for his second Bike Build after enjoying the experience the first time.&lt;/p&gt;&lt;p&gt;“It was such a good time last year that I had to participate again,” he said. “Typically, I do not have time to participate in charitable events due to other obligations, so it was a great opportunity afforded by DRMP for me to give to others. Sometimes life and work can be so busy, so it is great that we are able to help others in a way that we are sure will bring joy into their lives.”&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/dsc_0024_edited.jpg?v=1784751871404&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;em&gt;&lt;small&gt;Stormwater Engineering Intern Daniela Orjuela and &lt;em&gt;Structures Engineer Warren Allen, PE, &lt;/em&gt;pose with the bike they built together.&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;&lt;p&gt;Survey Analyst Johnathan Porto, CST1, said the event provides an opportunity to serve the community and connect with coworkers.&lt;/p&gt;&lt;p&gt;“We are a pretty busy group, but when we can, we like to help out,” he said. “We get to help the community and hang out with coworkers from different teams that we don&#039;t get to talk to every day, so it&#039;s nice to see new faces. It just feels like the right thing to do.”&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/ei3a1602_edited.jpg?v=1784751903783&quot;&gt;&lt;/p&gt;&lt;p&gt;&lt;em&gt;&lt;small&gt;Survey Crew Chief Matt Piombino (pictured left) and Survey Analyst Johnathan Porto, CST1, ( pictured right) assemble bikes together.&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;&lt;p&gt;Porto said he doesn’t typically volunteer outside of work, “but whenever we get the opportunity to do so at work, we all join in as a group.&lt;/p&gt;&lt;p&gt;“It&#039;s a nice change of pace from the day-to-day work. It&#039;s rewarding to know we can do some good by doing something as simple as putting a few bikes together, no matter how much we mess up,” he joked. “Sorry, bike quality control guys.”&lt;/p&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;div class=&quot;inline-gallery-wrap&quot;&gt;
			&lt;div
				class=&quot;static-page-inline-gallery embedded-gallery&quot;
				style=&quot;&quot;
				data-fx=&quot;blindX&quot;
				data-speed=&quot;250&quot;
				data-timeout=&quot;0&quot;
				data-type=&quot;embedded_with_thumbs&quot;
				data-has-fullscreen-mode=&quot;0&quot;
				data-thumb-height=&quot;&quot;
			&gt;
				&lt;div class=&quot;stage&quot;&gt;
					
				
					&lt;div class=&quot;slide placeholder&quot;&gt;
						
							&lt;div class=&quot;image&quot;&gt;&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0032_edited.jpg&quot; alt=&quot;Dsc 0032 Edited&quot; /&gt;&lt;/div&gt;
						
					&lt;/div&gt;
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0032_edited.jpg&quot; alt=&quot;Dsc 0032 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0049_edited.jpg&quot; alt=&quot;Dsc 0049 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/EI3A1521_edited.jpg&quot; alt=&quot;Ei3a1521 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/EI3A1591_edited.jpg&quot; alt=&quot;Ei3a1591 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0018_edited.jpg&quot; alt=&quot;Dsc 0018 Edited&quot; class=&quot;landscape&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image portrait&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_001_edited.jpg&quot; alt=&quot;Dsc 001 Edited&quot; class=&quot;portrait&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/EI3A1531_edited.jpg&quot; alt=&quot;Ei3a1531 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image portrait&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0042_edirted.jpg&quot; alt=&quot;Dsc 0042 Edirted&quot; class=&quot;portrait&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/EI3A1598_edited.jpg&quot; alt=&quot;Ei3a1598 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image portrait&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0043_edited.jpg&quot; alt=&quot;Dsc 0043 Edited&quot; class=&quot;portrait&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image portrait&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0005_edited.jpg&quot; alt=&quot;Dsc 0005 Edited&quot; class=&quot;portrait&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/EI3A1547_edited.jpg&quot; alt=&quot;Ei3a1547 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0008_edited.jpg&quot; alt=&quot;Dsc 0008 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/EI3A1543_edited.jpg&quot; alt=&quot;Ei3a1543 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image portrait&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0038_edited.jpg&quot; alt=&quot;Dsc 0038 Edited&quot; class=&quot;portrait&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image portrait&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0047_edited.jpg&quot; alt=&quot;Dsc 0047 Edited&quot; class=&quot;portrait&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0045_edited.jpg&quot; alt=&quot;Dsc 0045 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0020_edited.jpg&quot; alt=&quot;Dsc 0020 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/DSC_0754_edited.jpg&quot; alt=&quot;Dsc 0754 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				
				&lt;div class=&quot;slide&quot;&gt;
					
						&lt;div class=&quot;image landscape&quot;&gt;
							
								&lt;img src=&quot;/uploads/application/files/static-gallery/1348577/EI3A1646_edited.jpg&quot; alt=&quot;Ei3a1646 Edited&quot; class=&quot;landscape&quot; loading=&quot;auto&quot; /&gt;
							
						&lt;/div&gt;
					
					
				&lt;/div&gt; &lt;!-- /.slide --&gt;
			
				&lt;/div&gt; &lt;!-- /.stage --&gt;
			&lt;/div&gt; &lt;!-- /.embedded-gallery --&gt;
		&lt;/div&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fwekiva-parkway-section-8-interchange-closes-gap-improves-regional-travel</guid>
					<title>Wekiva Parkway Section 8 Interchange Closes Gap, Improves Regional Travel </title>
					<pubDate>Tue, 21 Jul 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fwekiva-parkway-section-8-interchange-closes-gap-improves-regional-travel</link>
					<description>&lt;p&gt;The Wekiva Parkway Section 8 Interchange completed the final connection of Central Florida’s beltway, addressing a critical transportation gap while improving regional mobility, enhancing safety, and strengthening connectivity between I-4, SR 417, and SR 429. This multiple award-winning design-build project highlights DRMP’s expertise in innovative engineering, collaborative design-build delivery, and cost-effective solutions that overcame complex corridor challenges, reduced project risks, and delivered a more reliable route for thousands of motorists traveling through the region.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;Before the Wekiva Parkway Section 8 Interchange was constructed, motorists traveling across Central Florida often had to leave the region&#039;s expressway system and navigate local roads to travel between I-4, SR 417, and SR 429. The missing link created congestion, reduced travel reliability, and limited regional connectivity. Today, that gap is gone.&lt;/p&gt;

&lt;p&gt;As the final connection needed to complete Central Florida&#039;s beltway, the Wekiva Parkway Section 8 Interchange improves mobility, enhances safety, and provides a more direct route for the tens of thousands of drivers who rely on this corridor.&lt;/p&gt;

&lt;p&gt;The Wekiva Parkway Section 8 Interchange is a significant achievement for our Alternative Delivery Department and a reflection of the dedication, expertise, and commitment of everyone involved. The project’s eight major industry awards recognize the efforts of our team and partners in overcoming complex challenges and delivering a critical connection for Central Florida. We are grateful for the opportunity to contribute to a project that demonstrates the value of alternative delivery and sets a strong example of what can be achieved through thoughtful planning and execution.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/wekiva_parkway1_compressed.jpg?v=1784646186106&quot;&gt;&lt;/p&gt;

&lt;p&gt;As lead designer, DRMP partnered with The Lane Construction Corporation (contractor) to deliver the $274.5 million design-build project. The team&#039;s collaborative design-build approach transformed significant engineering challenges into opportunities for innovation. Located within one of Florida&#039;s most constrained transportation corridors, the project required solutions for limited right-of-way, high groundwater, weak soils, extensive utility infrastructure, and a major Duke Energy transmission line while maintaining traffic on I-4, one of the state&#039;s busiest interstates.&lt;/p&gt;

&lt;p&gt;By strategically realigning I-4, the project avoided relocating the Duke Energy transmission line, saving millions of dollars and years of potential delays while allowing construction to occur largely offline. Additional design innovations preserved existing infrastructure, reduced bridge deck area by 200,000 square feet, reused roadway and drainage systems where feasible, and generated approximately $75 million in cost savings without compromising quality or performance.&lt;/p&gt;

&lt;h3&gt;&lt;b&gt;A Landmark Achievement&lt;/b&gt;&lt;/h3&gt;

&lt;p&gt;The project included 2.63 miles of new limited-access toll road, 20 new bridges, reconstruction of 2 miles of I-4 to accommodate future I-4 Beyond the Ultimate express lanes, advanced intelligent transportation systems, all-electronic tolling, and extensive roadway, drainage, lighting, signage, and traffic control improvements.&lt;/p&gt;

&lt;p&gt;Sustainability was further advanced through reduced impervious surface area, wetland protection, preservation of conservation easements, and the reuse of existing infrastructure where possible.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/wekiva_parkway2.jpg?v=1784646220952&quot;&gt;&lt;/p&gt;

&lt;p&gt;The result is a landmark achievement in transportation infrastructure that demonstrates how design-build delivery can accelerate schedules, maximize value, and deliver complex projects with measurable benefits.&lt;/p&gt;

&lt;p&gt;The industry&#039;s recognition reflects that success. The project has earned eight major awards, including:&lt;/p&gt;

&lt;ul&gt;
	&lt;li&gt;American Society of Highway Engineers (ASHE) National Project of the Year Award (Over $100 million category) (2026)&lt;/li&gt;
	&lt;li&gt;American Council of Engineering Companies (ACEC) National Recognition Award Engineering Excellence Awards (2026)&lt;/li&gt;
	&lt;li&gt;ACEC Florida Grand Winner in the Transportation Category (2026)&lt;/li&gt;
	&lt;li&gt;National Award of Merit from the Design-Build Institute of America (DBIA) in Transportation (Other than Aviation) Category (2025)&lt;/li&gt;
	&lt;li&gt;Project of the Year from the DBIA Florida Region in the Transportation - Structures Category (2025)&lt;/li&gt;
	&lt;li&gt;Engineering News-Record (ENR) Southeast Highway/Bridge Award of Merit in the Best Projects Competition (2025)&lt;/li&gt;
	&lt;li&gt;Florida Transportation Builders’ Association (FTBA) Best in Construction Award for Design-Build (2025)&lt;/li&gt;
	&lt;li&gt;Outstanding Design-Build or Construction Manager at Risk Project Award from ACEC Florida and FDOT (2025)&lt;/li&gt;
&lt;/ul&gt;

&lt;p&gt;The strongest design-build projects begin with decisions made early when design and construction work together to solve challenges before they become obstacles. The Wekiva Parkway Section 8 Interchange demonstrates the value of that approach, where early collaboration helped address complex constraints, reduce risk, and deliver a critical connection for Central Florida.&lt;/p&gt;

&lt;hr&gt;
&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;
&lt;div class=&quot;col first&quot;&gt;
&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/tlallathin.jpg?v=1784141121835&quot;&gt;&lt;/h3&gt;
&lt;/div&gt;

&lt;div class=&quot;col last&quot;&gt;
&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/tj-lallathin-pe-dbia&quot;&gt;TJ Lallathin, Jr., PE, DBIA,&amp;nbsp;&lt;/a&gt;serves as Executive Vice President of Alternative Delivery.&amp;nbsp;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;

						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fsurveying-one-of-golf-s-most-legendary-holes</guid>
					<title>Surveying One of Golf’s Most Legendary Holes </title>
					<pubDate>Tue, 14 Jul 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fsurveying-one-of-golf-s-most-legendary-holes</link>
					<description>&lt;p&gt;DRMP provided survey services for the replacement of the deteriorating bulkhead surrounding one of professional golf&#039;s most iconic putting greens. Using advanced geospatial technology and precise field coordination, our team delivered the accurate survey data needed to preserve the landmark&#039;s original design while enabling successful construction.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;There’s an iconic putting green in Ponte Vedra Beach, Fla., surrounded by water and recognized around the world as one of professional golf’s most famous holes. The site serves as the backdrop for one of the sport’s premier annual tournaments each March, generating a significant economic impact for the region and area businesses.&lt;/p&gt;&lt;p&gt;It’s a test of precision and nerve for golfers as coastal winds, surrounding water, and tight margins leave little room for error.&lt;/p&gt;&lt;p&gt;When the time came to replace the deteriorating bulkhead surrounding the green, DRMP&#039;s St. Augustine survey team was entrusted with providing the survey data needed to assist with the project. Specific venue and event names are not mentioned in this article in accordance with licensing and branding restrictions.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/vpor4222_edited.jpg?v=1783977220559&quot;&gt;&lt;/p&gt;&lt;p&gt;As a subconsultant to the project’s contractor, Riptide Marine &amp; Land Construction, DRMP completed a fast-turnaround pre-construction survey for approximately 400 feet of bulkhead. This work builds on DRMP&#039;s ongoing partnership with Riptide, which has included survey support for the Fort Matanzas Seawall &amp; Boardwalk Improvements project in St. Johns County and the Gamble Rogers Seawall Replacement project in Flagler County.&lt;/p&gt;&lt;p&gt;We were pleased to be selected to support this high-profile project, reflecting the trusted working relationship and consistent service we&#039;ve developed over time with Riptide.  &lt;/p&gt;&lt;p&gt;Fieldwork was completed on an as-needed basis over five days, allowing our team to efficiently capture existing conditions within the project’s active and constrained work windows.&lt;/p&gt;&lt;p&gt;Because the golf venue remained fully operational for the first week of the project, field activities were mindfully coordinated around play while maintaining the accuracy needed to support construction. Our survey team performed the work in proximity to an existing seawall, which required careful attention to tight field conditions and alignment with existing features.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/3a_edited.jpg?v=1783977444450&quot;&gt;&lt;/p&gt;&lt;p&gt;To document existing conditions, our team used a combination of unmanned aerial vehicle (UAV) mapping, static 3D laser scanning, RTK GPS control, and total station surveying. The resulting data provided a comprehensive site map of the bulkhead and surrounding features, giving the contractor and design team the information needed to lay the groundwork for the project’s success. The effort included full-area scanning to ensure a complete baseline record was captured during initial field mobilization.&lt;/p&gt;&lt;p&gt;“Accuracy was critical on this project because the intent was to preserve the existing geometry and character of the original design,” DRMP Senior Right-of-Way Mapper and Project Manager Mike Brown, PSM, said. “Even minor deviations in the field could have affected the alignment and overall form of the feature, so the emphasis was on capturing conditions in a way that reflected what was already there as closely as possible.”&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/20260602_093715_edited.jpg?v=1783977498553&quot;&gt;&lt;/p&gt;&lt;p&gt;The survey also involved marking the locations for 69 piles to guide installation and keep the bulkhead properly aligned. Field Crew Supervisor Marshall Batten managed UAV data collection and stakeout calculations, while Survey Technician Alex Ferrari performed static laser scanning from multiple control positions to generate a comprehensive point cloud for any future site work.&lt;/p&gt;&lt;p&gt;While technically straightforward, the project carried unique significance because of its setting and the precision needed to make sure the existing design stayed the same. By delivering reliable survey data on a compressed schedule, DRMP helped facilitate improvements to one of golf’s most iconic landmarks while preserving its distinctive character.&lt;/p&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fport-st-lucie-intersection-upgrade-improves-safety-at-village-and-tradition-parkways</guid>
					<title>Port St. Lucie Intersection Upgrade Improves Safety at Village and Tradition Parkways</title>
					<pubDate>Tue, 07 Jul 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fport-st-lucie-intersection-upgrade-improves-safety-at-village-and-tradition-parkways</link>
					<description>&lt;p&gt;DRMP delivered a comprehensive redesign of one of Port St. Lucie’s busiest intersections, transforming a high-crash, congestion-prone corridor into the city’s first protected bike intersection while improving traffic operations for all users. Through multidisciplinary collaboration, innovative engineering, and safety-focused design, DRMP developed a cost-effective solution that enhances mobility, reduces conflict points, and creates a safer, more connected intersection for drivers, pedestrians, cyclists, and transit riders.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;For years, drivers, cyclists, pedestrians, and transit riders navigating the intersection of Village Parkway and Tradition Parkway in Port St. Lucie, Fla., have dealt with chronic congestion and safety hazards. One of the city’s busiest intersections – and the first major crossroads west of I-95 – had become known for gridlock, near misses, and dangerous crashes as rapid growth in the Tradition area pushed traffic volumes beyond what the intersection could comfortably handle.&lt;/p&gt;

&lt;p&gt;Local reports and traffic data indicate hundreds of crashes and a high volume of enforcement activity at the intersection, including an incident in which a 14-year-old boy on a bicycle was struck by a car and airlifted to the hospital, underscoring the urgent need for safety improvements.&lt;/p&gt;

&lt;p&gt;To address these ongoing challenges, the City of Port St. Lucie tasked DRMP with redesigning the intersection to enhance safety, reduce congestion, and improve mobility for all users. In April 2026, the Port St. Lucie City Council approved a $1.5 million construction project based on DRMP’s design. Construction is expected to begin in August, marking the start of long-awaited improvements.&lt;/p&gt;

&lt;h3&gt;&lt;b&gt;Responding to Complex Project Needs &lt;/b&gt;&lt;/h3&gt;

&lt;p&gt;The City initially retained Alta Planning + Design, DRMP’s partner firm, to create a quick build concept for a protected intersection. A protected intersection is one with enhanced safety features that help protect pedestrians and bicyclists through curb extensions and dedicated paths. Given the immense capacity needs of the intersection, a traffic analysis was commissioned to evaluate impacts and determine whether additional enhancements are needed. This resulted in elevating the needs of the intersection from a quick build into a reconstruction project to accommodate the vehicular capacity needs, while retaining the vulnerable road user safety needs.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/pic1.png?v=1782785458225&quot;&gt;&lt;/p&gt;

&lt;p&gt;&lt;small&gt;&lt;em&gt;Community members attend a public meeting on Aug. 19, 2025, to provide input and share feedback on the project.&lt;/em&gt;&lt;/small&gt;&lt;/p&gt;

&lt;p&gt;The project transitioned to DRMP after Planning Group Leader Alia Awwad, PE, joined the firm, where she remains as project manager. As the project advanced into design, DRMP Boca Officer Leader and Roadway Group Manager&amp;nbsp;Evhen Kyj, PE, assumed duties as engineer of record for the roadway design,&amp;nbsp;while Patsy Fuschetto, PE, served as engineer of record for the traffic and lighting design.&lt;/p&gt;

&lt;p&gt;The design process involved extensive coordination with staff, outreach to the community, and presenting to the City Council. At the same time, the surrounding area continued to grow rapidly, with new retail development and increasing traffic demand adding urgency to the effort.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/pic3_edited-2.jpg?v=1782785232790&quot;&gt;&lt;/p&gt;

&lt;p&gt;&lt;em&gt;&lt;small&gt;DRMP Planning Group Leader Alia Awwad, PE, left, stands on stage during a project presentation at an Aug. 19, 2025 public meeting.&amp;nbsp;&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;The project became a true collaboration across DRMP’s disciplines. Roadway, planning, traffic signalization, lighting, signing, pavement marking, structures, and drainage professionals all played a role in delivering a solution for the City of Port St. Lucie at this important intersection.&lt;/p&gt;

&lt;h3&gt;&lt;b&gt;Safety-Driven Design with Cost Efficiency&lt;/b&gt;&lt;/h3&gt;

&lt;p&gt;A key achievement of the design team was improving intersection operations and safety without compromising structural integrity or relying on unnecessary infrastructure replacement. While avoiding mast arm replacements resulted in significant cost savings, those savings were a byproduct of a safety-driven engineering analysis process, not the objective.&lt;/p&gt;

&lt;p&gt;DRMP conducted extensive field investigations, documenting bolt configurations at mast arm foundations, evaluating structural loading capacities, and reviewing historical Florida Department of Transportation (FDOT) design criteria. This analysis ensured that any design decisions improved safety under new signal configurations.&lt;/p&gt;

&lt;p&gt;Through a detailed engineering review, the team developed alternative signal mounting solutions that reduced structural loading demands. This allowed the existing mast arms to be safely retained and eliminated the need for replacement while preserving long-term structural performance.&lt;/p&gt;

&lt;h3&gt;&lt;b&gt;Safer Streets for All Modes&lt;/b&gt;&lt;/h3&gt;

&lt;p&gt;The project also focused heavily on multimodal safety. DRMP reconstructed the intersection corners to create Port St. Lucie’s first protected bike intersection, providing protected corners and paths for pedestrians and cyclists and allowing cyclists to cross safely using bike crossings along the pedestrian crossing for enhanced, dedicated safety. Curb ramps were realigned to improve accessibility, and a busy city bus stop was relocated farther from the intersection to improve operations and safety for transit users.&lt;/p&gt;

&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/alt3.png?v=1782785347838&quot;&gt;&lt;/p&gt;

&lt;p&gt;&lt;em&gt;&lt;small&gt;A rendering depicts the design alternative selected by the community during the public engagement process.&lt;/small&gt;&lt;/em&gt;&lt;/p&gt;

&lt;p&gt;The improvements address nearly every aspect of the intersection’s operation. To relieve congestion and improve traffic flow, the team extended the eastbound left-turn lanes to maximize vehicle storage and lengthened the dedicated eastbound right-turn lane. Southbound traffic heading eastbound toward I-95 – one of the heaviest movements at the intersection – was converted into a triple-left-turn configuration to better accommodate traffic.&lt;/p&gt;

&lt;p&gt;Additional capacity improvements included widening the westbound approach from two through lanes to three through lanes while maintaining two left-turn lanes and a dedicated right-turn lane. Turning signals were added, signal heads were shifted and upgraded, and new “No U-turn” and “No Turn on Red” signage was incorporated to improve safety and reduce conflict points.&lt;/p&gt;

&lt;p&gt;The team also proposed drainage improvements to maintain proper flow and relocated street lighting from the median along the western leg to create additional room for the expanded left-turn lanes.&lt;/p&gt;

&lt;p&gt;For DRMP, the Village Parkway and Tradition Parkway Intersection Improvement Project demonstrates how multidisciplinary collaboration, technical problem-solving, and proactive communication came together to deliver much-needed safety improvements for one of the fastest-growing cities in the nation.&lt;/p&gt;

&lt;hr&gt;
&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;
&lt;div class=&quot;col first&quot;&gt;
&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/aawwad.jpg?v=1762965924601&quot;&gt;&lt;/h3&gt;
&lt;/div&gt;

&lt;div class=&quot;col last&quot;&gt;
&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/alia-awwad-pe&quot;&gt;Alia Awwad, PE,&lt;/a&gt; serves as a Planning Group Leader for DRMP’s Transportation Market Sector.&amp;nbsp;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;

&lt;hr&gt;
&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;
&lt;div class=&quot;col first&quot;&gt;
&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/ekyj.jpg?v=1782784197967&quot;&gt;&lt;/h3&gt;
&lt;/div&gt;

&lt;div class=&quot;col last&quot;&gt;
&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/evhen-kyj-pe&quot;&gt;Evhen Kyj, PE,&lt;/a&gt; serves as Boca Roadway Group Leader for DRMP’s Transportation Market Sector.&amp;nbsp;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;

&lt;hr&gt;
&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;
&lt;div class=&quot;col first&quot;&gt;
&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/pfuschetto-min.jpg?v=1782784337251&quot;&gt;&lt;/h3&gt;
&lt;/div&gt;

&lt;div class=&quot;col last&quot;&gt;
&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/patsy-fuschetto-pe&quot;&gt;Patsy Fuschetto, PE, &lt;/a&gt;serves as a Boca Roadway Project Manager for DRMP’s Transportation Market Sector.&amp;nbsp;&lt;b&gt;&lt;/b&gt;&lt;/p&gt;
&lt;/div&gt;
&lt;/div&gt;

						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fwhat-does-safety-look-like-at-drmp-through-a-safety-leaders-eyes</guid>
					<title>What Does Safety Look Like at DRMP Through a Safety Leader’s Eyes?</title>
					<pubDate>Thu, 25 Jun 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fwhat-does-safety-look-like-at-drmp-through-a-safety-leaders-eyes</link>
					<description>&lt;p&gt;Creating a safe workplace requires attention to the conditions, behaviors, and processes in daily operations. DRMP Environmental Health and Safety Manager David Couch works with employees at the firm to strengthen safety awareness, support compliance, and promote a culture that takes safety seriously. In recognition of National Safety Month, this Q&amp;amp;A explores Couch’s approach to safety leadership, industry challenges, and the importance of ensuring every employee returns home safely each day.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;An overloaded power strip. An open file cabinet drawer. A cluttered storage area. These may not be the hazards that immediately come to mind when people think about workplace safety, but according to DRMP Environmental Health and Safety Manager David Couch, they can be just as important as the risks found in the field.&lt;/p&gt;&lt;p&gt;With a background spanning warehouse distribution, general manufacturing, heavy steel manufacturing, construction, maritime operations, and fire rescue, Couch brings a wide perspective to safety leadership. Since joining DRMP in April 2026, he has traveled to the firm’s regional offices and project locations, working to understand operations firsthand and support a culture where safety is a collective commitment and responsibility.&lt;/p&gt;&lt;p&gt;In recognition of National Safety Month, this Q&amp;A highlights Couch’s approach to safety leadership, the challenges facing the engineering and construction industries, and why he views himself as a coach, teacher, and mentor. Underlying that philosophy is a goal that guides his approach to safety: making sure everyone goes home at the end of the day.&lt;/p&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;With more than 20 years in environmental health and safety leadership, what do you believe separates a strong safety culture from a reactive one?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;A strong safety culture is proactive rather than reactive. It&#039;s built on visible leadership, employee involvement, and consistent accountability. Organizations with strong cultures don&#039;t wait for incidents to drive action. They identify hazards early, encourage employees to speak up, and integrate safety into daily planning and operations.&lt;/p&gt;&lt;p&gt;Throughout my career, including more than 100 Occupational Safety and Health Administration (OSHA) inspections without a fine, I&#039;ve found that the most successful organizations are those where safety is owned at every level. When leadership is engaged and employees trust that concerns will be addressed, safety becomes part of the way work gets done, which reduces risk and improves overall performance.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;You&#039;ve worked across industries ranging from construction and manufacturing to maritime and distribution. How does that broad experience influence your approach to safety at DRMP?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;DRMP’s work spans office environments, field operations, roadway activities, surveying, engineering support, and construction-related services, so it is important that our safety programs are practical, adaptable, and scalable across different types of work. Having worked in dynamic and high-risk environments, I understand the importance of developing programs that not only meet regulatory requirements but also function effectively in real-world operations.&lt;/p&gt;&lt;p&gt;Some of the best safety improvements I’ve seen throughout my career came from involving employees, supervisors, and operational leaders early in the process. That is one of the approaches I want to continue strengthening at DRMP, building programs that support the work our teams perform while encouraging participation, communication, and joint responsibility throughout the organization.&lt;/p&gt;&lt;p&gt;Another benefit of working across industries is the ability to apply lessons learned and best practices from one environment to another. Whether it is hazard recognition, fleet safety, incident prevention, training systems, or field accountability, many successful strategies can be adapted and tailored to improve overall safety performance. My goal is to help DRMP continue building a safety culture that is proactive, sustainable, and incorporated into everyday operations across all business lines.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;What are some of the biggest safety challenges facing the engineering and construction industries today?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;One of the biggest safety challenges in engineering and construction is managing increasing operational complexity while maintaining consistent performance across multiple projects, teams, and environments. Faster schedules, tighter timelines, workforce shortages, and changing regulations all add pressure.&lt;/p&gt;&lt;p&gt;The industry is dealing with experience gaps as seasoned workers retire and newer employees enter the field. This makes strong onboarding, mentorship, and ongoing training essential for maintaining hazard awareness and safe decision-making.&lt;/p&gt;&lt;p&gt;Mental fatigue, distraction, and heavy workloads are also growing concerns. Employees today are often managing high workloads, extended travel, long hours, changing project demands, and constant communication through phones and technology. These factors directly impact situational awareness and increase risk in field and driving activities.&lt;/p&gt;&lt;p&gt;Consistency across diverse contractors and project teams remains another major challenge, as does managing roadway and fleet safety, which continues to be a leading source of serious incidents.&lt;/p&gt;&lt;p&gt;One of the most important challenges is preventing complacency. Organizations must continuously reinforce hazard recognition, field engagement, planning, and communication to maintain awareness and prevent normalization of risk.&lt;/p&gt;&lt;p&gt;Companies that treat safety as a core part of operations, not just a compliance requirement, are best positioned to manage these risks effectively.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;Safety is often associated with jobsites, but you&#039;ve emphasized that office environments matter, too? What are some of the most overlooked workplace hazards people don&#039;t think about?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;When people think about workplace safety, they often focus on construction sites or field operations, but office environments have their own set of risks that are often underestimated because they develop gradually.&lt;/p&gt;&lt;p&gt;The most common are ergonomic and repetitive strain issues, things like poor workstation setup, prolonged sitting, and repetitive computer use. These can lead to long-term musculoskeletal injuries that impact health and productivity over time.&lt;/p&gt;&lt;p&gt;Slip, trip, and fall hazards are also often overlooked in office settings, whether from cords, housekeeping issues, or wet entryways. These remain some of the most common workplace injuries across industries.&lt;/p&gt;&lt;p&gt;Another area is preparedness. Employees are not always familiar with emergency procedures such as evacuations, severe weather response, or medical events, yet those situations require quick, informed action.&lt;/p&gt;&lt;p&gt;More broadly, safety also includes factors like fatigue, stress, and distraction, especially when employees are traveling or balancing multiple priorities.&lt;/p&gt;&lt;p&gt;The goal at DRMP is to build a safety culture that recognizes that every employee and every work environment matter, whether someone is working in the field, operating on a roadside project, driving between locations, or working in an office.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;You travel regularly to DRMP&#039;s regional offices and project locations. Why is it important to have a hands-on, visible approach to safety leadership?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;A hands-on, visible approach to safety leadership is important because effective safety programs cannot be managed solely from behind a desk. Every office, project site, and operational environment has unique challenges and exposures that are best understood through direct engagement with employees and field operations.&lt;/p&gt;&lt;p&gt;Visiting DRMP’s regional offices and project locations allows me to see how work is being performed, understand operational challenges firsthand, and build stronger relationships across the company. This visibility also creates opportunities for open communication and collaboration, which are essential for identifying hazards, improving processes, and strengthening safety culture.&lt;/p&gt;&lt;p&gt;When safety leaders are present in the field – observing operations, participating in discussions, and listening to employee feedback – it reinforces that safety is an active priority rather than just a written policy. It builds trust, encourages open communication, and supports early identification of issues before they become larger problems, while keeping leadership connected to day-to-day operations.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;You&#039;ve overseen safety on billion-dollar, multi-year projects without a significant event. How do you maintain high safety standards while supporting project schedules and operational goals?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;On large, fast-paced projects, I operate from the principle that safety and production are not competing priorities. They work together when safety is built into the planning process from the start.&lt;/p&gt;&lt;p&gt;The most effective way to maintain high standards is through early risk identification during pre-planning and coordination. That includes evaluating schedule constraints, logistics, subcontractor activities, and changing field conditions so potential issues are addressed before work begins.&lt;/p&gt;&lt;p&gt;Once work is underway, consistent communication and strong field presence are critical. Staying engaged with project teams, supervisors, and contractors helps ensure expectations remain aligned and allows issues to be addressed quickly without disrupting progress.&lt;/p&gt;&lt;p&gt;I also rely on leading indicators, such as observations, near misses, training, and corrective actions to identify trends early and keep performance on track over the life of a project.&lt;/p&gt;&lt;p&gt;Strong safety performance on large projects comes from integrating safety into daily execution so that planning, communication, and field leadership all support safe and productive operations.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;Training is a major part of your background, including holding all four major OSHA authorized instructor certifications. How do you make safety training relevant and engaging for employees at every level, including those who may be uninterested or do not take it seriously?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;One of the most important lessons I’ve learned throughout my career is that effective safety training is not about simply presenting regulations or checking a compliance box. It is about making the information relevant to the employee performing the work. I focus on real-world application rather than just theory, helping employees understand not only what the requirements are, but why they matter and how they help protect people, improve operations, and prevent incidents.&lt;/p&gt;&lt;p&gt;Engagement is also critical. Using actual examples, field experience, case studies, scenario-based learning, and open discussion helps make training more relatable and easier to retain. Different groups learn differently, so training must be tailored to the audience while maintaining consistent safety expectations. For employees who may be skeptical or uninterested, credibility and experience matter. People are more likely to participate when they know the instructor understands their work environment and can connect safety concepts to real operational challenges.&lt;/p&gt;&lt;p&gt;At the end of the day, successful training is about creating understanding, engagement, and ownership so employees leave with knowledge they can apply immediately and a clearer understanding of why safety matters beyond compliance.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;You&#039;ve describedf yourself as a coach, teacer, and mentor rather than an enforcer. Why is relationship-building such an important part of effective safety leadership?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;Effective safety leadership is built on trust, communication, and credibility. While compliance and procedures are important, long-term safety success depends on people. Employees are more likely to report concerns, participate in safety programs, and follow procedures when they know leadership is genuinely invested in their well-being.&lt;/p&gt;&lt;p&gt;That’s why I view safety leadership as a balance of coaching, teaching, mentoring, and accountability. Building strong relationships encourages open communication and helps employees feel comfortable speaking up about hazards before they become incidents. It also helps move safety beyond compliance by giving employees a better understanding of the “why” behind expectations. Employees are more likely to take ownership of safety rather than view it as something imposed on them. Coaching and mentorship help develop critical thinking, hazard recognition, and personal accountability, which are essential for building a proactive safety culture.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;One of your core messages is that &quot;everyone goes home safe.&quot; What does that philosophy mean to you personally?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;The phrase “everyone goes home safe” is more than a slogan to me. It represents the responsibility we have to protect people and the understanding that every decision made in the workplace can have a real impact on someone’s life, family, and future.&lt;/p&gt;&lt;p&gt;Over the course of my career, I have dealt with three workplace fatalities, and those experiences permanently shaped my perspective on safety leadership. In addition to my professional safety career, I also served in the volunteer fire service as a fire chief, where I witnessed firsthand the devastating impact that serious injuries, fatalities, and emergency situations can have on individuals, families, coworkers, and entire communities. Those are experiences that stay with you, and they remind you how important it is to never become complacent when it comes to safety.&lt;/p&gt;&lt;p&gt;Every employee should have the opportunity to return home to their family in the same condition they arrived to work. That belief influences how I approach training, leadership, planning, communication, and field engagement every day.&lt;/p&gt;&lt;p&gt;Many serious incidents are preventable when organizations maintain strong communication, proper planning, accountability, and operational awareness.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;div class=&quot;q-and-a&quot;&gt;&lt;div class=&quot;question&quot;&gt;&lt;b&gt;For someone considering a career at DRMP, what would you want them to know about the firm&#039;s commitment to safety and employee wellbeing?&lt;/b&gt;&lt;/div&gt;&lt;div class=&quot;answer&quot;&gt;&lt;p&gt;I would want them to know that the firm is committed to building a strong culture centered around safety, employee well-being, professionalism, and continuous improvement.&lt;/p&gt;&lt;p&gt;Safety at DRMP is not viewed simply as a compliance requirement. It is part of how we plan to work, support employees, and operate as an organization.&lt;/p&gt;&lt;p&gt;One of the things that stands out about DRMP is the willingness of leadership and employees across the organization to engage in the safety process and work collaboratively toward improvement. There is a genuine effort to strengthen programs, improve communication, standardize processes where appropriate, and ensure employees have the resources and support needed to work safely and effectively.&lt;/p&gt;&lt;p&gt;I would also want potential employees to know that their voice matters. Building a strong safety culture requires communication, employee involvement, and mutual respect. Employees are encouraged to raise concerns, ask questions, contribute ideas, and participate in improving workplace safety. That type of collaboration helps create a stronger organization and a more supportive work environment for everyone.&lt;/p&gt;&lt;b&gt;&lt;/b&gt;&lt;/div&gt;&lt;/div&gt;&lt;hr&gt;&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;&lt;div class=&quot;col first&quot;&gt;&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/davidcouch.jpg?v=1782397150261&quot;&gt;&lt;/h3&gt;&lt;/div&gt;&lt;div class=&quot;col last&quot;&gt;&lt;p&gt;&lt;a href=&quot;https://drmp.com/drmperspective/david-couch&quot;&gt;David Couch &lt;/a&gt;serves as DRMP&#039;s Environmental Health and Safety Manager. &lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
				<item>
					<guid>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fdrmp-s-parking-studies-help-reduce-development-costs-through-smarter-design</guid>
					<title>DRMP’s Parking Studies Help Reduce Development Costs Through Smarter Design</title>
					<pubDate>Tue, 16 Jun 2026 04:00:00 +0000</pubDate>
					<link>https%3A%2F%2Fdrmp.com%2Fdrmperspective%2Fdrmp-s-parking-studies-help-reduce-development-costs-through-smarter-design</link>
					<description>&lt;p&gt;As development costs continue to rise, parking infrastructure has become one of the most expensive decisions developers make – and one of the easiest areas to overspend. Without a clear understanding of actual parking demand, projects can end up burdened with unnecessary construction costs, inefficient layouts, and underused spaces. DRMP’s transportation experts provide parking study expertise for commercial, mixed-use, and residential developments throughout the United States to help clients optimize parking design, improve operations, and reduce development costs.&lt;/p&gt;
</description>
					<content:encoded>&lt;div class=&quot;ss-section-wrap&quot;&gt;&lt;div class=&quot;ss-section-wrap-inner&quot;&gt;
						&lt;div class=&quot;ss-content-block col-1&quot;&gt;
							&lt;p&gt;As development costs continue to rise, parking infrastructure has become one of the most expensive decisions developers make – and one of the easiest areas to overspend. Without a clear understanding of actual parking demand, projects can end up burdened with unnecessary construction costs, inefficient layouts, and underused spaces.&lt;/p&gt;&lt;p&gt;DRMP’s transportation experts provide parking study expertise for commercial, mixed-use, and residential developments throughout the United States to help clients optimize parking design, improve operations, and reduce development costs.&lt;/p&gt;&lt;p&gt;Structured parking does not come cheap. A single space in a parking garage can cost approximately $50,000-$100,000 to build. For large developments, that figure can climb into millions of dollars. Without a detailed analysis of actual demand, developers risk overbuilding parking and tying up valuable capital in unused spaces.&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Understanding Your Parking Requirement&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;DRMP’s team has experience interpreting local parking codes and applying them to proposed projects. Local codes are often vague and written for standard uses, so determining how a specific site can be brought into compliance can be complex. This interpretation provides an essential foundation for future parking planning and supports requests for parking reductions.&lt;/p&gt;&lt;p&gt;Unique circumstances, such as the differences between affordable and market-rate housing, can create significant variations in parking demand that are not always formally reflected in local codes but can support project financials without sacrificing site use. Meanwhile, existing properties may benefit from updated codes with potential to repurpose or reorient parking facilities to better service the tenants.&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Shared Parking Creates Significant Savings&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;One of the most valuable tools in parking planning is shared parking analysis. Shared parking allows different land uses with varying peak demand times to use the same parking supply. For example, office parking demand typically declines in the evening just as restaurants, entertainment venues, and retail activity increase.&lt;/p&gt;&lt;p&gt;Rather than constructing separate parking structures for each use, developers can evaluate overall site parking needs and design around the combined peak usage periods. In many cases, the total number of required spaces is substantially lower than if each use were calculated independently.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/adobestock_1078618579_editorial_use_onlyjpeg.jpg?v=1781269910334&quot;&gt;&lt;/p&gt;&lt;p&gt;The financial implications are significant. Eliminating just 50 structured parking spaces could save a developer approximately $2.5 million. On larger projects, right-sizing parking infrastructure can result in savings of several million dollars while also freeing up land for additional development opportunities.&lt;/p&gt;&lt;p&gt;DRMP has also helped clients identify situations where projects were significantly overparked. In many mixed-use developments, parking requirements are calculated independently without accounting for the reality that many spaces sit empty for large portions of the day. By analyzing actual parking demand patterns, DRMP has helped developers reduce unnecessary parking construction and reclaim valuable space within their developments.&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Designing Parking for Efficiency&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;Our team recently completed a parking study for a new parking garage serving Bank of America in Charlotte, N.C. The study evaluated the garage’s secured gate system, including how vehicles queue at entry and exit points. While gates improve security and access control, they can also create congestion if not properly designed. DRMP analyzed peak-hour traffic volumes and modeled vehicle stacking to ensure queues would not spill back onto adjacent roadways.&lt;/p&gt;&lt;p&gt;The garage also incorporates smart parking technology that provides real-time information showing where spaces are available on each level. These systems often use overhead indicators – typically green lights for open spaces and red lights for occupied spaces – to help drivers identify available parking. By directing drivers to open spaces more efficiently, the system reduces internal circulation, shortens search times, and minimizes driver frustration. Efficient circulation is critical because inconvenient parking can discourage customers, tenants, and visitors from returning to a site.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/adobestock_2018802663jpeg.jpg?v=1781269944986&quot;&gt;&lt;/p&gt;&lt;p&gt;The general garage layout was another key component of the Bank of America parking analysis, including ramp design, circulation patterns, and access points. A well-designed garage allows vehicles to move smoothly while maintaining safe pedestrian access. Poor layout decisions, by contrast, can create traffic jams and safety concerns that impact the entire development.&lt;/p&gt;&lt;p&gt;DRMP is also evaluating emerging parking technologies, including automated parking systems such as AUTOParkit. These systems allow drivers to leave their vehicle at a designated drop-off point while a conveyor system automatically parks and stores the vehicle within a parking garage. As these systems gain traction in dense urban environments, such as in cities like Miami, DRMP evaluates how efficiently vehicles can enter, exit, and be processed without causing traffic backups onto surrounding streets.&lt;/p&gt;&lt;p&gt;DRMP also conducted a parking study for Duke Raleigh Hospital as the hospital planned a new tower on its urban campus where available land was limited. Initial discussions centered around constructing an additional parking garage to accommodate projected demand.&lt;/p&gt;&lt;p&gt;Instead, DRMP evaluated the existing parking decks and identified an opportunity to improve efficiency through restriping and circulation changes. The existing garage operated as a two-way facility, which required wider aisles and reduced the amount of usable parking area on each level. By converting the structure to a one-way circulation pattern and redesigning the striping layout, the hospital gained approximately 200 additional parking spaces within the existing structure, eliminating the need to build a new garage. The result saved substantial construction costs while maximizing the use of existing infrastructure.&lt;/p&gt;&lt;p&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/2026/adobestock_113495512jpeg.jpg?v=1781270090682&quot;&gt;&lt;/p&gt;&lt;h3&gt;&lt;b&gt;Helping Clients Prioritize with a Solutions Matrix&lt;/b&gt;&lt;/h3&gt;&lt;p&gt;Every development presents unique parking challenges, which is why DRMP provides clients with actionable solutions rather than a one-size-fits-all recommendation.&lt;/p&gt;&lt;p&gt;As part of our evaluation and recommendations, DRMP develops a priorities matrix that evaluates potential parking and circulation improvements based on implementation difficulty, cost, and overall impact. The matrix ranked options from high to low priority, essentially creating a menu of strategies clients could choose from based on their operational goals and budget.&lt;/p&gt;&lt;p&gt;Rather than telling the client what they had to do, the matrix helped guide decision-making and allowed stakeholders to focus on the solutions that best aligned with their priorities. This approach often leads to more cost-effective outcomes and greater client confidence in the final plan.&lt;/p&gt;&lt;p&gt;Developers often focus heavily on building design and aesthetics while parking considerations are addressed late in the process. However, parking can be a huge factor in determining whether a development succeeds.&lt;/p&gt;&lt;p&gt;Too little parking can frustrate users and drive customers away. Too much parking can unnecessarily inflate construction costs and erode profitability or housing affordability.&lt;/p&gt;&lt;p&gt;A thorough parking study helps strike the right balance, ensuring convenient access for users while avoiding unnecessary construction expenses. As developments become more complex and budgets tighten, strategic parking analysis is emerging as an essential tool for maximizing operational efficiency, improving user experience, and protecting the financial performance of a project.&lt;/p&gt;&lt;p&gt;If you are interested in having a parking study conducted for your project, please click&lt;a href=&quot;https://drmp.com/connect/traffic-impact-analysis-request&quot;&gt; here.&lt;/a&gt; &lt;/p&gt;&lt;p&gt; &lt;/p&gt;&lt;hr&gt;&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;&lt;div class=&quot;col first&quot;&gt;&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/jschick.jpg?v=1720539707592&quot;&gt;&lt;/h3&gt;&lt;/div&gt;&lt;div class=&quot;col last&quot;&gt;&lt;p&gt;&lt;a href=&quot;/drmperspective/john-schick&quot;&gt;John Schick, PTP,&lt;/a&gt; serves as Traffic Analysis Group Leader for DRMP’s Transportation Market Sector.&lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;&lt;hr&gt;&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;&lt;div class=&quot;col first&quot;&gt;&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/rstephenson.jpg?v=1720535807483&quot;&gt;&lt;/h3&gt;&lt;/div&gt;&lt;div class=&quot;col last&quot;&gt;&lt;p&gt;&lt;a href=&quot;/drmperspective/rynal-stephenson-pe&quot;&gt;Rynal Stephenson, PE&lt;/a&gt;, serves as Chief Traffic Analysis Engineer for DRMP’s Transportation Market Sector.&lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;&lt;hr&gt;&lt;div class=&quot;responsive-grid-layout-row twenty-eighty&quot;&gt;&lt;div class=&quot;col first&quot;&gt;&lt;h3&gt;&lt;img alt=&quot;&quot; hind=&quot;&quot; siliguri=&quot;&quot; src=&quot;https://drmp.com/uploads/images/Headshots/gvaughan.jpg?v=1720533894876&quot;&gt;&lt;/h3&gt;&lt;/div&gt;&lt;div class=&quot;col last&quot;&gt;&lt;p&gt;&lt;a href=&quot;/drmperspective/grady-vaughan-pe-ptoe-ptp&quot;&gt;Grady Vaughan, PE, PTOE, PTP,&lt;/a&gt; serves as Traffic Analysis Lead for DRMP’s Transportation Market Sector.&lt;b&gt;&lt;/b&gt;&lt;/p&gt;&lt;/div&gt;&lt;/div&gt;&lt;p&gt;&lt;a href=&quot;https://drmp.us1.list-manage.com/subscribe/post?u=b555c57e346d392edf4e97421&amp;id=4c06378fa6&quot;&gt;&lt;img alt=&quot;&quot; src=&quot;https://drmp.com/uploads/images/DRMPerspectives/eWIRE/perspective_ewire-subscribe-banner-01.png?v=1781270127455&quot;&gt;&lt;/a&gt;&lt;/p&gt;
						&lt;/div&gt; &lt;!-- /.ss-content-block --&gt;
					&lt;/div&gt;&lt;/div&gt; &lt;!-- /.ss-section-wrap --&gt;</content:encoded>
				</item>
			
	</channel>
	</rss>
	