- Discover
-
Expertise
- Construction Services
-
Design-Build
- US 17-92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Innovation Way) Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Ecological Services
- Federal Services
-
Geographic Information Systems (GIS)
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Air Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
- Subsurface Utility Engineering (SUE)
- Surveying & Mapping
- Trails / Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Air Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Water Resources / Stormwater Management
- Visualization Services
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
Bringing Design and Construction Together
DRMP’s design-build team takes pride in delivering superior infrastructure by working with our clients and contractors throughout every step of the project. As one entity, DRMP works cohesively with the contractor to deliver projects implementing the most up-to-date design technology on advanced schedules. Our experienced design-build team has managed and prepared design efforts for major bridge replacements, roadway widenings, new interchanges and overpasses. By developing the design parameters simultaneously with budgetary goals, we maximize the project’s overall value.
US 17-92 Interchange at SR 436
SR 9B Extension from I-95 to US 1
A. Max Brewer Bridge Replacement
I-95 Widening from the Indian River/Brevard County Line to Malabar Road
SR 528 (Innovation Way) Interchange
SR 570 Polk Parkway Widening from I-4 to Pace Road
I-95 Express Lanes and Ramp Signals – Phase 3A-1
Pollard Road Extension over Peace Creek