- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
1977
DRMP founded by William Dyer, PE; Robert Riddle, PE; Russel Mills, PE, and Armand “Larry” Precourt, PLS, in Orlando, FL
Opens doors with 25 employees
Provides civil engineering and surveying services for land development/private sector projects
1980
Hires Information Technology Professional to help implement Computer Aided Design and Drafting (CADD)
Begins serving public sector
Adds Environmental, Utilities and Water Resources services
1982
Adds Transportation services
1984
Adds Structural Engineering services
1986
Performs first Limited Access project, SR 417 (Eastern Beltway) from North of SR 50 to Aloma Avenue for Orlando-Orange County Expressway Authority
1990
Staff size is 250
1992
William Dyer, PE; Robert Riddle, PE, and Armand “Larry” Precourt, PLS, retire
1993
Wayne Chalifoux, PE, joins Board of Directors
Ranks for the first time on Orlando Business Journal’s “Annual Top 25 Engineering Firms”
1995
Opens office in Panama City Beach, FL
1996
Lucius Cushman, Jr, PE, Jon Meadows, PE, and Steve Precourt, PE, join Board of Directors
Adds Global Positioning System (GPS) equipment for Surveying and Mapping services
1997
Russel Mills, PE, retires
Donaldson Barton, Sr., PE, becomes President
1998
Adds Subsurface Utility Engineering (SUE) services
1999
Donaldson Barton, Sr., PE, retires as President
Wayne Chalifoux, PE, named as President
Adds Construction Engineering Inspection (CEI) services
Larry Smith, Jr., PE, named Vice President
2000
Donaldson Barton, Jr., PLS, and Lawrence Smith, Jr., PE, become Managing Principals and join Board of Directors
Opens office in Jacksonville, FL
Performs first Intelligent Transportation System project, Seminole Dynamic Message Signs
Staff size is 150
John Burkett, PE, named Vice President
2001
Opens offices in Fort Myers, Lakeland, Tampa and Tallahassee, FL
Expands to North Carolina by opening office in Charlotte, NC
Ken Kniel, PE, named Vice President
2002
Opens office in Chipley, FL
Glenn Lusink, PSM, Mark Prochak, PE, and Mark Puckett, PE, named as Vice Presidents
2005
William Stone, PE, joins as Managing Principal
Acquires Burch Surveying in Fort Myers, FL
Opens office in Gainesville, FL
Performs first Design-Build Project, SR 91 (Florida’s Turnpike) Leesburg Toll Plaza Expansion for Florida’s Turnpike Enterprise
Mike Albano, PE, Colette Moss, PE, and Ben Faust, PE, named as Vice Presidents
2006
Moves headquarters to newly constructed building just five-miles from original location
Opens offices in Pensacola and Boca Raton, FL
Staff size is 500
2008
Steve Precourt, PE, steps down as Managing Principal and Board of Director
Adds Construction Engineering Inspection Services in North Carolina
2010
Staff size is 240
Jim Beck, PE, AICP, ENV SP, named Vice President
2011
Dyer, Riddle, Mills & Precourt, Inc. name changes to DRMP, Inc.
2013
Performs first LiDAR project, SR 686 Resurfacing in Largo, FL for FDOT District Seven
2014
Opens office in Raleigh, NC
Adds Geographic Information Systems (GIS) services
Inspects and assesses infrastructure damage in Escambia County, FL after record two-day rainfall causes flash flooding
2015
Glenn Lusink, PSM, Mark Prochak, PE, and Mark Puckett, PE, named as Managing Principals
Opens Melbourne, FL office as hub for federal services
Adds In-Service Bridge Inspection (NBIS) services
2016
Lucius Cushman, Jr., PE, and William Stone, PE, retire as Managing Principals
Joseph Di Benedetto, PLS, Scott Garth, PE, LEED AP ND, Tracie Samillano, SHRM-SCP, PHR, Robert Walker, CCM, LEED Green Associate named as Vice Presidents
2017
DRMP Celebrates 40 Years
Lucius Cushman, Jr., PE, and William Stone, PE, retire from Board of Directors
Glenn Lusink, PSM, Mark Prochak, PE, and Mark Puckett, PE, named to Board of Directors
Adds Unmanned Aerial Services (UAS) to its surveying and mapping/geospatial capabilities
Reopens office in Fort Myers, FL
Adds surveying and mapping services to North Carolina
Chris Cantrell, Lisa Greene, CPSM, James Highland, PE, TJ Lallathin, Jr., PE, Jeffrey Lance, PSM, George McLatchey, PWS, CEP, and Amanda Woods, PE, named Vice Presidents
Staff size is 350
2018
Opens office in Stockbridge, GA
Opens office in Troutman, NC
Staff size is 400
2019
Staff size is 500
Opens office in Asheboro, NC
Wayne Chalifoux, PE, retires as President/CEO
Larry Smith, Jr. PE, named as President/CEO
2020
Glenn Lusink, PSM, named Chief Operations Officer
Opens office in DeLand, FL
Wayne Chalifoux, PE, retires as Chairman of the Board
Larry Smith Jr., PE, LEED GA, named Chairman of the Board
DRMP ranks in the Orlando Business Journal's Elite 50 Companies for the first time
Erica Jernigan, PE, James Krygowski, CPA, Chris Wild, PSM, named as Vice Presidents
2021
Don Barton Jr., PSM, named Chief Financial Officer
Michael Albano, PE, and Colette Moss, PE, named to Board of Directors
DRMP ranks No. 39 out of 100 on the Zweig Group Hot Firm List
Kyle Brown, PE, Scott Nickle, and J. Barry Cabaniss, PLS, named as Vice Presidents
Acquires Bussen-Mayer Engineering Group, Inc. expanding presence on Florida's East Coast
2022
Jon Meadows, PE, retires as Vice President, Managing Principal and from Board of Directors
DRMP enters into Strategic Partnership with Trilon Group
James Beck, PE, AICP, ENV SP and Robert Walker, CCM joins Board of Directors
Don Barton Jr., PSM retires as Chief Financial Officer, Vice President, Managing Principal and from Board of Directors
DRMP appoints five service line directors: Federal Services Director Kyle Brown, PE; Surveying and Mapping/Geospatial Director Joseph Di Benedetto, PLS; Construction Services Director Erica Jernigan, PE; Alternative Delivery Director TJ Lallathin Jr., PE, DBIA; Transportation Director Amanda Woods, PE
Four chief officers appointed: Chief Information Officer Chris Cantrell; Chief Marketing Officer Lisa Greene, CPSM; Chief Financial Officer James Krygowski, CPA; Chief People Officer Tracie Samillano, SHRM-SCP, PHR
Mark E. Puckett, PE, retires as Vice President, Managing Principal and Board of Directors
Bill Faust, III, PSM, named Vice President
DRMP separates President/CEO role and responsibilities into two leadership positions. Larry Smith Jr, PE, LEED GA, retains role of CEO and Chairman of the Board. Glenn Lusink, PSM, assumes role of President and remains on Board of Directors.
Opens Sarasota, Fla. location
2023
Mark Prochak, PE, retires as Principal
DRMP Recognized with Gold-Level Cigna Healthy Workforce Designation™
Opens Richmond, VA location
James E. Beck, PE, ENV SP named Chief Strategy Officer
Michael Albano, PE named Chief Operations Officer
Robert M. Walker, CCM named Executive Vice President of Construction Services
Colette F. Moss, PE named Executive Vice President of Transportation
Acquires Geomatics, Corp. expanding surveying and mapping capabilities in Northeast Florida
Don Brown, PE, Matt Elliott, Frank Lopez, PSM, and August Thick II, PLS, named Vice Presidents
Staff size reaches 600
Celebrates one year anniversary of strategic partnership with Trilon Group
Merges with Ramey Kemp & Associates to grow Mid-Atlantic Region
2024
Opens office in Columbia, SC
Opens office in McLean, VA
Staff size reaches 700
John Burkett, PE, retires as Vice President
Ken Kniel, PE, retires as Vice President
Cary, NC office relocates to Raleigh, NC