- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
I-95 Express Lanes and Ramp Signals –
Phase 3A-1
The I-95 Express Lanes and Ramp Signals Phase 3A-1 is an ongoing $148.7 million design-build project in Broward County, Florida. Phase 3A-1 is the first of several phased construction projects. The 3A-1 portion is the stretch of I-95 from south of Broward Boulevard to north of Commercial Boulevard. I-95 is a highly traveled limited access highway that connects south Florida to the rest of the east coast of the United States. Due to this roadway’s high demand traffic, congestion typically impedes motorists especially during rush hour traffic.
DRMP assisted in the widening of I-95 over Powerline Road which involved the widening of I-95 for approximately 6.6-miles and included 13 bridge sites. The existing I-95 over Powerline Road Bridges are twin 4-span Steel Girder Bridges consisting of 97.3-foot approach spans and 153.3-foot main spans for an overall bridge length of 501-feet, with the two center spans being continuous. The substructures consist of reinforced concrete abutments and piers founded on prestressed concrete piles. The southbound bridge was widened 28.3-feet and the northbound bridge was widened 27.8-feet in order to incorporate two express lanes in each direction. The widening of the bridges was designed to match the existing structures, except for the pier foundations. With the coordination of the design-build team, drilled shafts were used in place of driven piles to support the new piers in order to minimize the disruptions to traffic along Powerline Road during construction.
The lane widening in each direction for the express lanes will result in a 2-lane express option for motorists to bypass general use lane congestion. These improvements to the I-95 limited access roadway will result in improved traffic flow for all commuters along the thoroughfare.
Key Facts
Location:
Florida
Client:
FDOT District Four
Size:
6.6-miles
Highlights:
- Lane widening
- Bridge widening
- Maintenance of Traffic (MOT)
- Lighting for navigation and aesthetic purposes
Services Provided:
Water Resources/Stormwater Management