- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
Barclay West
Barclay West was developed on one of the last remaining undeveloped large tracts of land in the City of Wilmington. The project aimed to transform this undeveloped land into a mixed-use development.
This project required a Traffic Impact Analysis (TIA) as part of the property rezoning. Additional TIA Updates were necessary as specific plans/tenants were identified for the development. Each TIA analyzed surrounding roadways and intersections to identify improvements necessary to mitigate additional traffic generated by the development. Improvements completed by the development include new traffic signals and turn lanes at off-site intersections. Roundabouts were constructed within the development to calm traffic and transition between residential, commercial, and office areas. The roundabouts were evaluated to determine appropriate configuration.
New traffic signals were designed as part of the project with one new signal along Independence Boulevard and one new signal along 17th Street. The traffic signals were designed as metal poles/metal arms.
Traffic engineers prepared design plans for off-site intersection improvements, including turn lanes and median improvements along the development access at 17th Street. Design plans included roadway design, storm drainage, traffic control, pavement marking, and signal design. Improvements at the 17th Street intersection included a pedestrian connection to the Cross City Trail from the development.
Barclay West represents a significant effort to revitalize one of the city’s final expansive, undeveloped areas. The project introduces a diverse array of amenities, including national and local restaurants, retail establishments, a movie theater, medical offices, a hotel, and residential apartments. The focus on this previously untouched parcel of land aims to not only enrich the cityscape but also meet the evolving needs of the community by providing a comprehensive and integrated urban environment.
Key Facts
Location:
Wilmington, N.C.
Client:
Cameron Management, Inc., Collett & Associates, LLC
Highlights:
Roundabout Analysis
New Traffic Signal
Development Rezoning Approval
Services Provided:
Hydraulics Design
Roadway Design
Traffic Analysis and Modeling
Traffic Engineering
Traffic Impact Analysis