- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
I-95 Widening from the Indian River/Brevard County Line to Malabar Road
The I-95 Widening from the Indian River/Brevard County Line to Malabar Road was a $51 million design-build project located in Brevard County, Florida. Florida’s many attractions and vacation destinations are constantly growing in popularity and demand, and I-95 has always been the major corridor that connects Florida’s east coast to the rest of the eastern United States. The increasing popularity fostered vehicular congestion on this stretch of thoroughfare through Brevard County and needed to be addressed.
The limited-access highway project called for DRMP's design to include median widening from 4-lanes to 6-lanes for 12.4-miles, the complete replacement of four insufficient bridges (two bridges at Fellsmere Canal and two at C-54 Canal) and the widening of two bridges at Sottile Canal. DRMP also provided drainage design services that included ponds and special ditches, drainage structures and extending box culverts. A detailed maintenance of traffic (MOT) plan was designed for the new bridges, widening areas and for the lengths of complete reconstruction of I-95. The Design-Build included signing and pavement marking and adding an extensive ITS system.
The 12.4-miles of DRMP-designed median widening provided Brevard and Indian River counties with a more efficient traffic flow for all motorists on I-95.
This roadway segment was part of an overall plan to provide 6-lanes on I-95 through FDOT District Five. DRMP was able to accomplish both of these goals in a single project. All bridge replacements were designed for maximum structure life, minimizing upkeep and maintenance costs. DRMP Water Resources applied innovative stormwater strategies for effective highway drainage.
Key Facts
Location:
Florida
Client:
FDOT District Five
Size:
12.4-miles
Highlights:
- Limited access roadway design
- 4-lane to 6-lane inside widening
- Bridge replacement
- Bridge widening
- Maintenance of traffic (MOT)
- Signing and pavement markings
- Intelligent transportation system (ITS)
Services Provided:
Water Resources/Stormwater Management