- Discover
-
Expertise
- Construction Services
-
Design-Build
- US 17-92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Innovation Way) Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Ecological Services
- Federal Services
-
Geographic Information Systems (GIS)
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Air Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
- Subsurface Utility Engineering (SUE)
- Surveying & Mapping / Geomatics
- Trails / Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Air Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Water Resources / Stormwater Management
- Visualization Services
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
Captain’s Cove Wastewater Plant Revisions & Permit Renewal
The Captain’s Cove Homeowner’s Association (HOA) needed a firm to inspect their 40-year-old wastewater facility on Pine Island.
DRMP’s analysis determined that, while the facility was structurally sound, its internal components were showing signs of damage. DRMP engineers developed design plans to repair the facility’s concrete tank and upgrade its flow equalization system as well as the chlorine contact tanks and filters. Services also included environmental coordination with the Florida Department of Environmental Protection to renew the facility’s permit.
DRMP led the restoration and upgrade efforts for the facility, which will be functional for another 20 years and will save the Captain’s Cove HOA over $200,000 by providing an alternative to replacing the entire structure.
Key Facts
Location:
Florida
Client:
Captain’s Cove HOA
Size:
40,000-gallons/day
Highlights:
- Flow equalization system
- Chlorine contact tanks
- Chlorine contact filters
- Concrete tank
Services Provided: