- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
NC 540 (Triangle Expressway) Southeast Extension (R-2828)
Referred to as the Southeast Extension of the Triangle Expressway, the Complete NC 540 project, from U.S. 401 to I-40, is a North Carolina Turnpike Authority design-build project. The $403 million project will bring the Raleigh Outer Loop (I-540) full circle. DRMP’s innovative Alternative Technical Concept (ATC) saved more than $1 million in costs.
DRMP provided project delivery, quality control, and interdisciplinary coordination services for the roadway design, bridge design, supplemental surveying, and subsurface utility coordination (SUE) elements for the 1.8-mile roadway portion of the project. DRMP also designed three bridge sites for the portion of the R-2828 project from east of Old Stage Road to east of Sauls Road.
NC-540 over the Juniper Branch bridge represents one of the more unique aspects of this project. The structures of the bridge are on a curved alignment with trapezoidal spans, and each of the 52 girders on the two bridges have a different length. DRMP proposed an Alternative Technical Concept (ATC) with an estimated cost savings of more than $1.3 million in construction, inspection, and maintenance. DRMP was able to reduce the bridge lengths from the original concept plans, while maintaining the requirements for the environmentally sensitive area. In developing the ATC, DRMP and the prime consultant worked together to maintain a 50-foot buffer to Juniper Branch and limit impacts to the wetland areas. The new bridge layout saved approximately 11,500 square-feet of bridge deck while making allowances for future bridge widening.
DRMP’s innovative design work, using the ATC, ultimately passes the cost savings down to taxpayers and is a major benefit of implementing the design-build method for project delivery. The completion of the overall Complete NC 540 project will ultimately connect drivers in the Raleigh area. This project is currently under construction.
Key Facts
Location:
North Carolina
Client:
NCDOT: NC Turnpike Authority
Size:
1.8-miles
Highlights:
- Bridge design
- Roadway design
- Alternative technical concept (ATC)