- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- Insights
- Connect
- Powered By Trilon
« Back
DRMP-Designed Turnpike Widening Project Highlighted in Gov. DeSantis’ $20 Billion Investment Announcement
October 7th, 2026
ORLANDO, Fla. — A Florida’s Turnpike Enterprise widening project designed by DRMP was among the completed improvements highlighted in a recent Florida Department of Transportation news release detailing Gov. Ron DeSantis’ announcement of more than $20 billion in investments to expand the Turnpike Mainline/State Road (S.R.) 91.
The $162 million Florida’s Turnpike Mainline/State Road (S.R.) 91 Widening from State Road 50 Interchange to Minneola Interchange project was completed in June 2026 for Florida’s Turnpike Enterprise. The project expanded approximately six miles of roadway from four to eight lanes in Orange and Lake counties to accommodate growing demand from local commuters and long-distance travelers and provide additional capacity during emergency evacuations.
According to FDOT, the broader initiative highlighted by DeSantis will expand the entire 320-mile Turnpike Mainline from South Florida to Interstate 75 in Wildwood to six or more lanes, adding more than 965 lane miles upon completion. The department identified the SR 50–Minneola widening as one of the completed improvements contributing to that expansion.
DRMP provided multidisciplinary design services for widening, which included bridge replacements, interchange improvements and upgrades to drainage, lighting, tolling, traffic operations and intelligent transportation systems, along with utility coordination, environmental permitting, surveying and right of way mapping.
A central challenge was designing the expansion and replacement bridges while keeping traffic moving through the busy corridor. DRMP designed the roadway and bridges with phased maintenance-of-traffic plans, incorporating temporary walls.
“Keeping traffic moving required us to plan how the roadway and bridge work would fit together through each phase of construction,” said Amanda Woods, DRMP executive vice president and director of transportation.
Woods served as the consultant project manager for the project.
“By integrating temporary structures and accommodating emergency shoulder use into the design, our team helped provide a path for construction to proceed while maintaining access through the corridor even during hurricane evacuations,” Woods said. “That coordination supported the Turnpike’s expansion and the local connections surrounding communities depend on.”
The project replaced Turnpike bridges at Jones Road, Old Highway 50 and Blackstill Lake Road, added a new overpass at Fosgate Road and replaced the County Road 438 and County Road 455 overpasses. A new West Orange Trail bridge accommodates pedestrians, bicyclists and equestrian users. Two roundabouts at the ends of the CR 455 overpass provide local road connections, with landscaping and lighting enhancements.
DRMP’s design brought together roadway and structural engineering, traffic operations, intelligent transportation systems, drainage, utility coordination, environmental permitting and surveying. The team also supported public involvement and coordination with local agencies to integrate the mainline improvements with surrounding roads and communities.
About DRMP
Since 1977, DRMP has earned a reputation as a trusted multidisciplinary civil engineering and surveying firm delivering innovative infrastructure solutions that strengthen communities. What began as a Florida-based surveying practice has grown into a leading Southeastern engineering consulting firm with more than 1,000 professionals across 32 offices.
Today, DRMP’s engineers, planners, surveyors and scientists partner with state transportation agencies, municipalities, federal clients and private developers to plan, design and deliver critical infrastructure. Our integrated services span surveying and geospatial services, civil engineering, land development and community planning by supporting projects that improve transportation infrastructure and mobility, resilience and quality of life across the Southeastern United States.
Ranked among Engineering News-Record’s Top 500 Design Firms in the United States, DRMP is recognized for helping clients solve complex infrastructure challenges through technical excellence, innovative thinking and trusted partnerships.
At the heart of our success is a collaborative approach built on long-standing relationships with the clients and communities we serve. By combining deep technical expertise with responsive service and local insight, we deliver solutions that are both forward-thinking and grounded in the needs of the communities they support. Learn more at drmp.com.
Posted in the category All.
In Other News
Oct5DRMP Named One of Central Florida’s Top Workplaces for Eighth Consecutive Year
ORLANDO, Fla. – DRMP ...See Details
Oct2After 50 Years in Surveying, Joe Di Benedetto, PLS, LS, Retires from DRMP
ORLANDO, Fla. – Joe D...See Details
Sep29Mark Ryan Named President of DRMP
ORLANDO, Fla. — DRMP ...See Details
Sep24DRMP Names Alex Calder, PLS, Survey Manager in Charlotte
CHARLOTTE, N.C. – DRM...See Details
Recent Articles
- 10/7/26DRMP-Designed Turnpike Widening Project Highlighted in Gov. DeSantis’ $20 Billion Investment Announcement
- 10/5/26DRMP Named One of Central Florida’s Top Workplaces for Eighth Consecutive Year
- 10/2/26After 50 Years in Surveying, Joe Di Benedetto, PLS, LS, Retires from DRMP
- 09/29/26Mark Ryan Named President of DRMP
- 09/24/26DRMP Names Alex Calder, PLS, Survey Manager in Charlotte




