- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
Orlando South Interchange Improvements
The Orlando South Interchange Improvements project is located in Orange County, Florida. The Orlando South Interchange serves to connect SR 528, Florida’s Turnpike (SR 91), and US 441. The highly traveled interchange was becoming increasingly congested and unable to meet the demands of the growing infrastructure of the surrounding areas as well as the anticipated traffic resulting from the widening of the adjacent SR 528. Florida’s Turnpike Enterprise knew it was time for a major update, including implementation of safety upgrades, to meet the demands of the developing area.
The design involved improvements to seven ramps and the construction of a new ramp to carry the westbound SR 528/southbound US 441 to SR 91 movement. Structural design included a new 2-lane ramp bridge over US 441 to carry the westbound SR 528/southbound US 441 to SR 91 movement. The bridge is a single span structure with a bridge length equal to 160-feet. The bridge is comprised of Florida-I 78 Beams supported by end bents founded on 18-inch square prestressed concrete piles. Other structural design elements included a thrie-beam railing retrofit on the adjacent existing ramp bridge over US 441, MSE walls, and permanent and temporary sheet pile walls. A box culvert extension was required at the existing dual cell bridge box culvert to accommodate the new ramp movement. Load ratings were performed for both the new and existing bridges, and the extended existing bridge box culvert. One overhead span sign structure was also included.
This project will improve both the function and safety of the Orlando South Interchange. The interchange improvements will support a higher traffic demand providing drivers with a faster and safer means of travel between SR 528, Florida’s Turnpike (SR 91) and US 441.
Key Facts
Location:
Florida
Client:
Florida’s Turnpike Enterprise (FTE)
Size:
160-feet
Highlights:
- Limited access facility
- Interchange improvements
- Roadside safety improvements
- New bridge construction
- Existing bridge railing retrofit
- MSE walls
- Permanent and temporary sheet pile walls
- Box culvert extension
- Box culvert repair and restoration
- Overhad span sign structure
Services Provided:
Subsurface Utility Engineering