- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
Complete 540, R-2828 (US 401 to I-40) Segment (Contractor Support)
The Southeast Extension, also known as the Complete 540 project, extends the Triangle Expressway from the NC 55 Bypass in Apex to US 64/US 264 (I-87) in Knightdale, completing the 540 Outer Loop around the greater Raleigh area. DRMP is providing specialty engineering services for the R-2828 Segment of the Complete 540 project, where the limits are from US 401 to I-40. DRMP’s specialty engineering expertise, specifically analysis services, were required for this project due to the unique lengths of the proposed bridge spans and girders. The contractor proposed placing a concrete pump truck and concrete supply trucks on the first two spans of Structure 5A to complete the remaining two spans of the bridge. Additionally, the contractor proposed placing the concrete pump truck and concrete supply trucks on the last two spans of completed Structure 5A to perform deck pours for two spans of the adjacent bridge, Structure 5B. The dual bridges, Structures 5A and 5B, had trapezoidal spans to avoid wetlands, while allowing for future widening. This bridge layout caused each of the spans and the girders to have unique lengths. For this reason, analysis was required for both of the bridges. Specialty engineering services included a concrete pump truck analysis, where DRMP is providing calculations/plans for placement of concrete pump trucks and supply trucks on bridge deck for top-down construction, as well as performing an out of tolerance pile analysis. Using the concrete pump truck for pouring the bridge decks allowed the contractor to move resources, (i.e. the trestle) to another bridge site on the project and reduce construction time. The ultimate project will link the Apex, Cary, Clayton, Garner, Fuquay-Varina, Holly Springs, and Raleigh communities, while easing congestion on local area roadways. |
Key Facts
Location:
North Carolina
Client:
Lane/Blythe Joint Venture for NCDOT
Size:
N/A
Highlights:
- Contractor support
- Specialty engineering
- Concrete pump truck analysis
- Out of tolerance pile analysis