I-75 at Overpass Road New Interchange Design-Build (Contractor Support)

When unforeseen circumstances required the design and construction of temporary walls, The Middlesex Corporation (Middlesex) sought an efficient designer to provide the required specialty engineering services to help keep this $64.5 million design-build interchange project on schedule.

Working for Middlesex, DRMP structural engineers provided temporary wall design to support the ongoing construction of this project. The project includes a new diamond interchange with a flyover ramp for westbound Overpass Road to access onto southbound I-75 with roadway widening occurring between the interstate and Old Pasco Road and between the interstate and Boyette Road.  

The specialty engineering services provided by DRMP's structural engineers helped keep the project’s construction on schedule.

Key Facts

Location:

Florida

Client:

Middlesex Corporation on behalf of FDOT District Seven

Size:

3.5-miles

Highlights:
  • Contractor support
  • Temporary wall design
  • Specialty engineering
Services Provided:

Alternative Delivery

Specialty Engineering

Structural Engineering