Ocean Boulevard Drainage Improvements

DRMP was hired to help alleviate chronic residential flooding along roadways on the island of Siesta Key. 

DRMP’s services included analysis, design and permitting to improve conveyance to the Grand Canal on Siesta Key.  Alternative analysis consisted of developing cost estimates for two alternative outfalls including a cost benefit analysis.  Services also included preliminary design and opinion of construction cost analysis, permitting, utility coordination, survey, subsurface utility engineering and public involvement. 

DRMP was able to meet the client’s expectation in providing analysis, design and permitting that alleviated chronic residential flooding on Siesta Key. 

 

Key Facts

Location:

Florida

Client:

Sarasota County

Size:

2,500-feet

Highlights:
  • Drainage retrofit
  • Resurfacing
  • New outfall
  • Sediment sump permitting
  • Public involvement
Services Provided:

Surveying & Mapping/Geospatial

Subsurface Utility Engineering

Transportation

Utilities Engineering

Water Resources/ Stormwater Management