- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
« Back
London Waterway Expansion Project Combats Neighborhood Flooding in a Creative Way
January 4th, 2023
DRMP’s design to alleviate flooding problems in a Palm Coast, Fla., neighborhood involved conceptualizing a unique, multi-purpose approach that delivers recreational and environmental benefits to the local community.
DRMP recently completed the design of the London Waterway Expansion Project for the City of Palm Coast. The project is located on 19.5 acres of vacant city-owned, wooded land in the Matanzas Woods Neighborhood and is surrounded by London and Leaver drives. The project is ready for construction and will take about a year to complete.
When working on this project, DRMP wanted to design something beyond your typical rectangular Florida retention pond for flood control and create a natural-looking, aesthetically pleasing stormwater system.
The firm came up with a concept to convert the piece of city-owned property into a lakeside neighborhood passive park that will increase flood storage capacity for Palm Coast residents and improve water quality for the environment.
Our design features the construction of an 11-acre naturally contoured lake with curvy edges for flood storage; two one-half acre islands of preserved vegetation to promote terrestrial and aquatic ecosystem interaction; two open overlooks with benches that have short trails and boardwalks leading to them; and plantings to encourage desirable native vegetation to improve habitat for various species and for erosion protection along the shoreline.
Changing Course
There was a considerable amount of public input during the design phase of this project. The original concept of our design changed after receiving feedback in a public meeting. During that meeting we presented two concepts.
The first design involved a minimal approach in terms of public access with a few short paths leading to pavilions. Our second design was more grandiose and provided wider public access with a few short paths leading to pavilions, a half-mile recreational loop crossing over the water and through both islands and a kayak launch.
However, neighborhood residents were concerned our design of an active park would pose parking issues and attract loiterers from outside of the neighborhood. In response, the design team corroborated with City staff, and we scaled back the design and modified the project to be more of a passive park.
More than a Retention Lake
The main purpose of the proposed 11-acre lake is flood control to increase the available flood storage in the London Waterway and help ease flooding in the northern part of the City.
The lake will provide stormwater treatment and improve the quality of water being discharged into the London Waterway, Hulett Branch downstream, and the receiving Pellicer Creek Aquatic Preserve. We used BMPTRAINS, a software program developed by the University of Central Florida Stormwater Management Academy, to determine pollutants in the water for the existing and proposed conditions.
The lake will be about 10-12 feet deep and includes 4.2 acres of littoral zone to promote native aquatic, wetland, and upland habitats. By planting water lilies, arrowhead, pickerelweed, rushes, as well as oak, cypress, and maple trees, along with using natural and biodegradable mulch material, the shoreline will be protected from erosion, and wildlife habitat will be created.
The proposed work required coordination and permitting with the St. Johns River Water Management District (SJRWMD), the Florida Fish and Wildlife Conservation Commission (FWC), the U.S. Army Corps of Engineers (USACE), and the Florida Department of Environmental Protection (FDEP).
We have secured a grant of $904,500 through the SJRWMD Cost-Share Program on behalf of the City to aid with funding for the construction costs of the project, and are working with the FWC to secure an additional $74,500 to aid with costs related to aquatic habitat creation.
Designing a high-quality stormwater project that goes beyond solving flooding issues and provides an environmental and recreational benefit to the local community was a unique and exciting opportunity.
Posted in the categories All, Water Resources/Stormwater Management .
Related Articles
- Nov21Giving Buses a Head Start in Raleigh, N.C. Raleigh's bustling corridors can make it...See Details
- Nov20Celebrating National GIS Day 2024As we celebrate National GIS Day, DRMP�...See Details
- Nov6Ewire Featured Story: PDES Team Guides Projects for Federal Compliance and SuccessLed by an experienced and versatile grou...See Details
- Nov6Expertise Highlight: Combating Flooding in Underserved Arkansas Communities In many predominantly Black rural towns ...See Details
Categories
- All
- Alternative Delivery
- Construction Services
- Disaster Resilience and Sustainability
- DRMPCares
- Ecological Services
- Federal Services
- Geographic Information Systems
- Land Development
- NEPA
- Project Development & Environment
- Structural Engineering
- Subsurface Utility Engineering
- Surveying & Mapping
- Traffic Impact Analysis
- Transportation
- Transportation Planning/Project Development
- Utilities Engineering
- Water Resources/Stormwater Management
Contributors
- Michael K. Albano, PE
- Bruno J. Arriola, PE, ENV SP
- Brent Bass, PE, PSM
- Cody Bayer, PE
- Donald W. Brown, PE
- Kyle Brown, PE
- Zach J. Carnahan, PE
- Brian Crowl, PE
- Patrick Day, PE
- Nick DeVito, PE
- Matt Floyd, PSM
- Deshon M. Fox, PE
- Scott Garth, PE, LEED AP ND
- Ryan M. Grab, CST II
- Robyn Hartz
- Jim Highland, PE
- TJ Lallathin, Jr., PE, DBIA
- Kelly Marton, GISP
- Meaghan McCarthy
- Jay McInnis, PE, CPM
- George McLatchey, PWS, CEP
- Michael McNeese
- Jeff Miller
- Ryan Mitchell, PE
- Lisa Moon, PE
- Megan E. Mott, PE
- Josh Norman
- Melissa Padilla Cintron, SIT
- Pavan Paiavula, PE
- Julian Poole, PE
- Joce Pritchett, PE
- Abby Rains
- Leo Rodriguez, PE
- Rachel L. Schmidt, PWS
- Logan Shappell
- Brian V. Smith
- Rynal Stephenson, PE
- Deston Taylor, EI
- August Thick II, PLS, CST III
- Steven L. Wallace, PE
- Orville Williams
- Amanda E. Woods, PE
Recent Articles
- 11/21/24Giving Buses a Head Start in Raleigh, N.C.
- 11/20/24Celebrating National GIS Day 2024
- 11/6/24Ewire Featured Story: PDES Team Guides Projects for Federal Compliance and Success
- 11/6/24Expertise Highlight: Combating Flooding in Underserved Arkansas Communities
- 11/6/24 DRMP Employees Join Forces to Create Lasting Impact in Local Communities