- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
« Back
DRMP Talks Effective Roundabout Design as Construction of Roundabouts Gains Traction
June 1st, 2023
Florida’s municipalities and transportation agencies are increasingly turning to roundabouts to improve traffic safety and congestion and reduce vehicular collisions. In fact, Florida ranks No. 1 with more roundabouts than any other state in the country, according to a 2022 Washington Post roundabout report. The rise is part of a national trend in which more cities and towns across the United States, including those in DRMP’s service areas, are constructing roundabouts as a safer alternative to traditional signage and signalized intersections.
Left-turn collisions, for example, are the most frequent and common types of vehicle crashes at signalized intersections. Typically, roundabouts are safer because their circular design improves traffic flow, minimizes traffic delays and congestion, lowers driver speeds, and significantly prevents vehicles from colliding with each other or pedestrians.
From mini- to multi-lane in size and complexity, roundabouts have contributed to a nearly 50 percent reduction in all crashes and an 80 percent reduction in serious injuries and fatalities, according to the Florida Department of Transportation (FDOT).
Safety Lies in Tailored Design
For a roundabout to be truly safe, it must be specifically designed for the area with the safety of both drivers and pedestrians in mind.
To determine specific design criteria, DRMP roadway engineers, like Steven D’Uva, PE, use data about the area and volumetrics studies where the roundabout will be constructed.
The volumetrics studies and data reveal several factors that come into play, including traffic volume, area demographics, the number of vehicles expected to use the roundabout, and the types of vehicles that would use the roundabout.
“For example, if a roundabout is being constructed in a residential area, there’s less need to account for a high volume of commercial trucks traveling through the area versus a major roadway that sees both traditional and commercial vehicles,” D’Uva said.
The area’s speed limit is another determinant. Designers take into consideration the speed of vehicles going through a roundabout with the goal for vehicles to travel at a maximum speed of 30 mph.
“We do that by designing a chicane, an artificial narrowing turn on the road, that introduces curves for drivers to slow down and yield,” D’Uva said. “Within the roundabout, we’re getting rid of some of the movements where drivers can cross over into another driver’s path.”
“We design the angles of the entry points such that the drivers are able to see oncoming cars in a circle and lower the speed by introducing curves before the roundabout. That way the driver must slow down to enter, or they must yield because cars are coming toward them,” he added.
Visibility is also important for an effective roundabout. DRMP’s designers consider factors, such as sight lines, placement of signs and signals, and other elements that could block visibility. Clear visibility helps drivers and pedestrians see each other and make safe decisions.
Special considerations are made for bicyclists and pedestrians at or near roundabouts. Angled bicycle ramps are added prior to the roundabout to encourage bicyclists to exit the roadway onto a wider sidewalk and re-enter on the opposite side of the roundabout.
Pedestrians and bicyclists alike would then cross the legs of the roundabout at a perpendicular angle with a much shorter crossing. Each leg of the roundabout would also be designed to have a pedestrian refuge area allowing them to have a safer place to wait for vehicles to come to a stop.
The ultimate goal, D’Uva said, is to eliminate as many conflict points as possible.
Here are just a few of the wide-ranging roundabout projects, shown in renderings, that DRMP engineers have supported:
SR 91 (Florida’s Turnpike Mainline) Widening from SR 50 Interchange to Minneola Interchange
Florida’s Turnpike Enterprise
The $162 million project called for the widening of 6 miles of SR 91 from a 4-lane to an 8-lane limited access facility. The design consisted of 6.5 miles of roadway reconstruction, including two interchanges and two roundabouts along CR 455 adjacent to an overpass structure. Florida’s Turnpike Enterprise tasked DRMP with designing a “dog bone” roundabout, a double roundabout, due to challenges with vehicles experiencing cross-over conflict.
The roundabouts were designed to reconfigure the angles to make it safer for drivers. The project also features a shared use path for pedestrians and cyclists to go across the bridge that is between the roundabouts. By providing separate entry and exit paths and minimizing conflict points, the dog bone roundabout design helps reduce congestion and improve safety at intersections.
SR 516 (Lake Orange Expressway) from Orange/Lake County Line to SR 429 (Segment 3)
Central Florida Expressway Authority
This project design involved a new systems interchange connecting SR 429 to SR 516, a new 4-lane limited access toll facility that extends to US 27. The project features a new intersection. The project features a new intersection with an original design to provide signalization, but the volume of traffic in the area was not enough to warrant a signal installation. DRMP engineers determined a “dog bone” double roundabout would be a safer alternative to slow down drivers at the interchanges.
The design also allows for future infrastructure changes if necessary and features a shared use path for future pedestrians. By providing separate entry and exit paths and minimizing conflict points, the dog bone roundabout design helps reduce congestion and improve safety at intersections.
West Matanzas Woods Parkway Extension
City of Palm Coast, Flagler County, Florida
This project design featured the modification of an existing roundabout that served as an entrance to the Sawmill Development. Due to a new 4-lane facility and a new public works facility being introduced near the neighborhood that would generate more traffic, DRMP provided a modified design of the existing single-lane roundabout to a multi-lane roundabout.
Related Articles
- Nov21Giving Buses a Head Start in Raleigh, N.C. Raleigh's bustling corridors can make it...See Details
- Nov20Celebrating National GIS Day 2024As we celebrate National GIS Day, DRMP�...See Details
- Nov6Expertise Highlight: Flooding Solutions Bring Relief to Arkansas CommunitiesIn many predominantly Black rural towns ...See Details
- Nov6 DRMP Employees Join Forces to Create Lasting Impact in Local CommunitiesIn North Carolina, employees in our Char...See Details
Categories
- All
- Alternative Delivery
- Construction Services
- Disaster Resilience and Sustainability
- DRMPCares
- Ecological Services
- eWire
- Federal Services
- Geographic Information Systems
- Land Development
- NEPA
- Project Development & Environment
- Structural Engineering
- Subsurface Utility Engineering
- Surveying & Mapping
- Traffic Impact Analysis
- Transportation
- Transportation Planning/Project Development
- Utilities Engineering
- Water Resources/Stormwater Management
Contributors
- Michael K. Albano, PE
- Bruno J. Arriola, PE, ENV SP
- Brent Bass, PE, PSM
- Cody Bayer, PE
- Donald W. Brown, PE
- Kyle Brown, PE
- Zach J. Carnahan, PE
- Brian Crowl, PE
- Patrick Day, PE
- Nick DeVito, PE
- Matt Floyd, PSM
- Deshon M. Fox, PE
- Scott Garth, PE, LEED AP ND
- Ryan M. Grab, CST II
- Robyn Hartz
- Jim Highland, PE
- TJ Lallathin, Jr., PE, DBIA
- Kelly Marton, GISP
- Meaghan McCarthy
- Jay McInnis, PE, CPM
- George McLatchey, PWS, CEP
- Michael McNeese
- Jeff Miller
- Ryan Mitchell, PE
- Lisa Moon, PE
- Megan E. Mott, PE
- Josh Norman
- Melissa Padilla Cintron, SIT
- Pavan Paiavula, PE
- Julian Poole, PE
- Joce Pritchett, PE
- Abby Rains
- Leo Rodriguez, PE
- Rachel L. Schmidt, PWS
- Logan Shappell
- Brian V. Smith
- Rynal Stephenson, PE
- Deston Taylor, EI
- August Thick II, PLS, CST III
- Steven L. Wallace, PE
- Orville Williams
- Amanda E. Woods, PE