Crescent Gateway New Century Park

The New Century Park project consisted of the preliminary master planning for a mixed use development of over 150-acres of undeveloped land. The focus was to address circulation, master utility connections and stormwater management. Unique site conditions presented challenges for the project including closed basins, major environmental constraints and requirements for connectivity.

DRMP provided multiple options for stormwater management, with technical information and models to confirm feasibility. Pond sizing and site location allowed the team to visualize development strategies and support early decision making. DRMP worked closely with other consultants to identify, delineate and mitigate for environmental constraints.   

Selecting pond locations and working with existing site environmental conditions was the primary focus to ensure the maximum development program could be achieved.

Key Facts

Location:

Florida

Client:

Crescent Communities, LLC

Size:

150-acres

Highlights:
  • Creative stormwater management solutions
  • Major infrastructure layout
  • Cost estimates
  • Earthwork
Services Provided:

Land Development

Utilities Engineering

Water Resources/Stormwater Management