- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
« Back
DRMP Leads Largest LED Lighting Conversion Project in Florida
May 22nd, 2024
Florida’s Turnpike Mainline stretches across 312 miles, traversing 11 counties within the state's peninsula, while the Turnpike Extension spans 47 miles.
The High-Pressure Sodium (HPS) lighting that illuminates the Turnpike, a familiar sight on many roadways, is antiquated and no longer being manufactured, making it difficult to repair and replace when necessary.
That is why Florida’s Turnpike Enterprise (FTE) has chosen DRMP as the prime consultant for the Districtwide HPS to Light-Emitting Diode (LED) Conversion Contract, which will convert 65.2 miles of roadway to modern LED lighting for Phase 1. This project marks the largest systemwide conversion in Florida and stands as one of DRMP’s most significant design accomplishments in our Traffic Department history. DRMP has offered Traffic Services since the 1980s.
LED lighting not only boasts extended longevity but also offers superior light quality while consuming less power. This translates to increased public safety as well as reduced maintenance and power costs. LED lighting on projects has become the modern standard nowadays, and the transition to LED lighting is underway across most of Florida's roadways.
As DRMP’s Traffic Division Leader and Vice President, I have found this project to be very rewarding. I get to work with a great client, challenge my excellent lighting staff, and help make the Enterprise facilities safer and more efficient.
Since 2002, I have specialized in designing lighting systems ranging from expansive expressway setups to intricate arterial networks. Much like Intelligent Transportation Systems (ITS), lighting design is becoming more technology driven and remains a niche, promising field.
A Challenging Conversion
The sheer size of this project, coupled with a challenging 13-month deadline for its design, required the depth of DRMP’s specialists in the firm’s Traffic, Structures, Environmental, Survey, and Utilities departments along with preferred subconsultants. It takes a committed large staff and a talented team to see this project through.
Phase 1 encompasses three projects. The first project is situated along State Road 821, part of the Homestead Extension of Florida's Turnpike (HEFT), extending from milepost 6 to 26. The second project focuses on State Road 570 (Polk Parkway) in Lakeland, spanning from milepost 0 to milepost 24. Lastly, our third project covers Broward and Palm Beach counties, encompassing approximately 21 miles along State Road 91, also known as Florida’s Turnpike.
To efficiently tackle the project, we implemented a geographic strategy with staff deployed from our northern, central, and southern DRMP Florida offices. Additionally, we reviewed as-builts drawings or design plans for more than 40 adjacent projects along the Enterprise system to ensure there were no conflicts and coordinated with Enterprise project managers regarding the lighting scope.
Our Structures Department evaluated the structural integrity of nearly 4,000 lighting poles within the designated project area, ensuring their safety and reliability.
DRMP has an exceptional team solely dedicated to lighting and electrical tasks. Gathering the necessary data to design an electrical system posed a significant challenge, but we overcame it with the use of Mobile LiDAR technology.
Conventional survey methods would have been costly and time consuming for comprehensive pole location surveys alone. By leveraging our Mobile LiDAR capabilities, we efficiently captured precise pole characteristics, including height, arm length, and setback, with an accuracy margin of within half a foot. This detailed information allows us to effectively model the new lighting system.
Our decision to use Mobile LiDAR was paramount for the success of data collection and to meet the project’s tight deadline. This method provided real-time, comprehensive asset data, crucial for meeting our tight project schedule.
Stakeholder Collaboration
The primary collaboration for this project involves various stakeholders, including environmental agencies focused on wetlands preservation, utility companies, and governmental bodies such as, FDOT districts, municipalities, and counties within the targeted regions. The project encompasses areas with an abundance of canals throughout South Florida as well as potential habitats for threatened species like sand skinks and gopher tortoises along the Polk Parkway.
As we approach substantial completion, our team remains focused on meeting our deadlines, with design progress slated for completion by November, following a 90 percent design completion milestone in June.
I am humbled to work with an outstanding team of professionals at DRMP dedicated to ensuring the success of our clients’ projects and safety for the traveling public. I look forward to seeing more modernized and sustainable lighting along the Enterprise systems that will be used for many years to come.
Jim W. Highland, PE, is a DRMP Vice President and Traffic Division Leader.
Related Articles
- Nov21Giving Buses a Head Start in Raleigh, N.C. Raleigh's bustling corridors can make it...See Details
- Nov20Celebrating National GIS Day 2024As we celebrate National GIS Day, DRMP�...See Details
- Nov6Ewire Featured Story: PDES Team Guides Projects for Federal Compliance and SuccessLed by an experienced and versatile grou...See Details
- Nov6Expertise Highlight: Combating Flooding in Underserved Arkansas Communities In many predominantly Black rural towns ...See Details
Categories
- All
- Alternative Delivery
- Construction Services
- Disaster Resilience and Sustainability
- DRMPCares
- Ecological Services
- Federal Services
- Geographic Information Systems
- Land Development
- NEPA
- Project Development & Environment
- Structural Engineering
- Subsurface Utility Engineering
- Surveying & Mapping
- Traffic Impact Analysis
- Transportation
- Transportation Planning/Project Development
- Utilities Engineering
- Water Resources/Stormwater Management
Contributors
- Michael K. Albano, PE
- Bruno J. Arriola, PE, ENV SP
- Brent Bass, PE, PSM
- Cody Bayer, PE
- Donald W. Brown, PE
- Kyle Brown, PE
- Zach J. Carnahan, PE
- Brian Crowl, PE
- Patrick Day, PE
- Nick DeVito, PE
- Matt Floyd, PSM
- Deshon M. Fox, PE
- Scott Garth, PE, LEED AP ND
- Ryan M. Grab, CST II
- Robyn Hartz
- Jim Highland, PE
- TJ Lallathin, Jr., PE, DBIA
- Kelly Marton, GISP
- Meaghan McCarthy
- Jay McInnis, PE, CPM
- George McLatchey, PWS, CEP
- Michael McNeese
- Jeff Miller
- Ryan Mitchell, PE
- Lisa Moon, PE
- Megan E. Mott, PE
- Josh Norman
- Melissa Padilla Cintron, SIT
- Pavan Paiavula, PE
- Julian Poole, PE
- Joce Pritchett, PE
- Abby Rains
- Leo Rodriguez, PE
- Rachel L. Schmidt, PWS
- Logan Shappell
- Brian V. Smith
- Rynal Stephenson, PE
- Deston Taylor, EI
- August Thick II, PLS, CST III
- Steven L. Wallace, PE
- Orville Williams
- Amanda E. Woods, PE
Recent Articles
- 11/21/24Giving Buses a Head Start in Raleigh, N.C.
- 11/20/24Celebrating National GIS Day 2024
- 11/6/24Ewire Featured Story: PDES Team Guides Projects for Federal Compliance and Success
- 11/6/24Expertise Highlight: Combating Flooding in Underserved Arkansas Communities
- 11/6/24 DRMP Employees Join Forces to Create Lasting Impact in Local Communities