- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
« Back
When Judgment Defines SUE: Bridging Records, Reality, and Responsibility
October 7th, 2025
Discrepancies between utility records and what’s actually in the ground aren’t rare. If you’ve been doing Subsurface Utility Engineering (SUE) work long enough, you expect it. Most of the time, you adjust and move on. The difference with SUE isn’t whether you find discrepancies – it’s how you interpret them.
True SUE is built on connecting what’s documented with what’s real, using experience-driven judgment to decide when something doesn’t add up. That judgment, applied consistently across the process, is what protects clients, budgets, and design integrity long before construction begins.
That lesson was reinforced during DRMP’s SUE work on the Florida Department of Transportation (FDOT) SR 212 (Beach Boulevard) Signalization and Lighting Improvements project in Jacksonville. This project aims to improve traffic flow and pedestrian safety along a busy stretch of road. Before any of the infrastructure improvements can happen, our SUE team must confirm that the underground utilities are where they’re supposed to be. This application of professional judgment prevents surprises later, such as hitting unexpected lines or needing to move utilities unnecessarily. DRMP’s SUE expertise also makes job sites safer for workers and helps engineers avoid costly design errors and potential legal issues.
What could have been dismissed as a small difference between what the records showed and what we found in the field became a reminder that the data we receive is only as reliable as the judgment applied to interpreting it. We discovered a mismarked gas main, avoided false relocations, and saved the design team from costly surprises in construction.
The Moment Things Didn’t Line Up
Records showed the gas main was located near the edge of the right-of-way. However, during DRMP’s initial investigation, our designating effort placed it about 15 feet closer to the road than expected. At first, this didn’t raise any red flags. But when we noticed something unusual with the signal readings, we returned the next day to take a closer look.
The signal we were tracking was weak and didn’t match the expected behavior for a gas line. It also didn’t terminate at end point, line up with utility markings, or the existing records. To verify, DRMP reopened the test hole. After further inspection, we involved the utility owner, TECO Peoples Gas. Their technicians confirmed that what we verified in a second location was not the gas main.
We regrouped and reassigned crew members to trace the gas line again, starting from the last location where we had a strong, reliable signal. By doing this, we were able to reestablish a clean path and follow the gas main’s actual route. We verified several sharp turns and a change in pipe material along the way, via additional excavation, which helped explain the earlier confusion. Ultimately, we confirmed the true location of the gas main was just 4 feet behind the curb.
Why It Matters
Had this gone unnoticed, the wrong utility would have been relocated, which means an unnecessary cost for the utility owner, delays to the project schedule, and a lot of last-minute scrambling once construction began. And that’s assuming the error was caught in time. By catching it early, we avoided those issues completely.
This is the part of SUE work that doesn’t always get attention – the slow, careful, behind-the-scenes work of comparing records, markings, and what you find underground. It’s not always obvious in the moment, but when it’s done right, everyone who relies on that information can move forward with confidence.
SUE is often described as a process – records, designating, locating, and data management. However, professional judgment is the glue that connects those components into a cohesive data set that clients and engineers can trust. That judgment isn’t defined by licensure alone; it’s the result of applied experience, critical thinking, and a refusal to accept assumptions at face value.
Relying on honed QA/QC practices to review the data at specific points with the appropriate level of personnel and experience is paramount to being able to identify discrepancies and taking steps toward resolution as early as possible. Determining ownership in congested areas requires more than a unilateral decision. It requires utility owner knowledge and engagement. Presenting utility owners with clear, defensible data and allowing for a response helps facilitate more accurate utility coordination efforts.
This project exemplifies what happens when judgment complements processes of proactive coordination, informed decision-making, and a strong QA/QC process at every step. It’s a reflection of the expertise, diligence, and teamwork at DRMP, and I’m proud of what our team delivered.
Albert Taylor serves as the Jacksonville Subsurface Utility Engineering (SUE) Leader for DRMP’s Survey and Mapping/Geospatial Market Sector.
Posted in the categories All, Subsurface Utility Engineering, Surveying & Mapping, Transportation, Transportation Planning/Project Development .
Related Articles
Oct9Behind the Scenes of DRMP’s Evolving Learning and Development ExperienceDRMP’s Learning and Development (L&...See Details
Sep10DRMP’s Learning Culture Sets the Standard for the A/E/C IndustryInvesting in the next generation of engi...See Details
Sep10DRMP Provides All the Right Ingredients for a Fulfilling Career Employees at DRMP get the full package �...See Details
Sep8DRMP Contracts with HGACBuy to Streamline Disaster Recovery ServicesDRMP has contracted with HGACBuy to assi...See Details
Categories
- All
- Alternative Delivery
- Civil Services
- Construction Services
- Disaster Resilience and Sustainability
- DRMPCares
- Ecological Services
- Electrical Engineering
- eWIRE
- Federal Services
- Geographic Information Systems
- Hurricane
- Land Development
- Learning & Development
- NEPA
- Project Development & Environment
- Structural Engineering
- Subsurface Utility Engineering
- Surveying & Mapping
- Traffic Impact Analysis
- Transportation
- Transportation Planning/Project Development
- Utilities Engineering
- Water Resources/Stormwater Management
Contributors
- Michael K. Albano, PE
- Bruno J. Arriola, PE, ENV SP
- Brent Bass, PE, PSM
- Cody Bayer, PE
- Maria Bazemore, PWS, AICP
- Paul Benvie, PE
- Donald W. Brown, PE
- Kyle Brown, PE
- Jake Burton
- Zach J. Carnahan, PE
- Brian Crowl, PE
- Patrick Day, PE
- Nick DeVito, PE
- Matt Floyd, PSM
- Deshon M. Fox, PE
- Scott Garth, PE, LEED AP ND
- Ryan M. Grab, CST II
- Robyn Hartz, INCE
- Justin Hayes, EI
- Lucas S. Helms, PE
- Jim Highland, PE
- Ryan Ianacone, CST II
- David Johnson, PE
- TJ Lallathin, Jr., PE, DBIA
- Jay McInnis, PE, CPM
- George McLatchey, PWS, CEP
- Michael McNeese
- Ryan Mitchell, PE
- Megan E. Mott, PE
- Josh Norman
- Melissa Padilla Cintron, SIT
- Pavan Paiavula, PE
- Ryan Pellarin, PE, CCM
- AJ Perkinson, PLS
- Julian Poole, PE
- Joce Pritchett, PE
- Leo Rodriguez, PE
- John Schick
- Rachel L. Schmidt, PWS
- Logan Shappell
- Rynal Stephenson, PE
- Albert Taylor
- Deston Taylor, PE, PTOE
- August Thick II, PLS, CST III
- Orville Williams
- Amanda E. Woods, PE