- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Visualization Services
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
« Back
Executive Brief: January-February 2024 Issue
January 31st, 2024
It has been a promising start to the new year for DRMP and our clients!
Since our merger with Ramey Kemp Associates (RKA) in August, DRMP has been hard at work, integrating new talent, and carving out a path for success. Together, we've defined clear objectives and goals that not only maximize the strengths of our new team but provide opportunities for both our firm and, most importantly, our clients.
One of these exciting opportunities is the official launch of a new service line – Traffic Impact Analysis (TIA), along with an expansion of our traffic engineering services. TIA is a critical aspect of traffic engineering, especially in today's landscape of growing land development and evolving traffic patterns. It's a service that we're proud to offer, reinforcing our commitment to building safe and efficient communities.
Equally important, those services will be performed by a team of qualified professionals - Rynal Stephenson, PE, Chief Traffic Analysis Engineer; John Schick, PTP, Traffic Analysis Group Leader; and Grady Vaughan, PE, PTOE, PTP, Traffic Analysis Lead - with decades of experience and an excellent reputation among their established clients.
Our vision is that in time TIA will be a service that we can expand. We are excited about the possibilities of reinforcing our traffic engineering services that continue our commitment to providing the best value and resources for our new and long-standing clients.
Posted in the category All.
In Other News
- Nov12Kayla Poulos, PE, Joins ACEC/NC Future Leaders Program RALEIGH, N.C. – Congr...See Details
- Nov4DRMP Cary, N.C., Office Relocates to Larger Space in Raleigh RALEIGH, N.C. –...See Details
- Oct23DRMP Strengthens Southeast Florida Presence with Evhen Kyj, PE, as New Boca Roadway Group Leader BOCA RATON, Fla. – To...See Details
- Oct21Jocelyn Haisch-Linn, PE, Promoted to Miscellaneous Structures Group Leader ORLANDO, Fla. – Jocel...See Details
Recent Articles
Archive
Events Calendar
DRMP Ewire
Our bi-monthly digital newsletter offering the latest company news.