SR 8 at SR 95 Phase 1 Improvements

SR 8 (I-10) at SR 95 (US 29) Phase 1 Improvements is a $8.5 million project located in Escambia County, Florida. The FDOT District Three desired to hire a firm to supply Construction Engineering Inspection (CEI) services for the project.

DRMP provided CEI services for this project that included road and bridge widening and new construction, drainage improvements, installation of a new traffic signal, pond construction, high-mast lighting and cantilever sign installation.

This widening project will provide for improved traffic flow and safety through the I-10 at US 29 intersection.

Key Facts

Location:

Florida

Client:

FDOT District Three

Size:

2.9-miles

Highlights:
  • Interchange
  • Widening
  • Signal
  • High-mast lighting
  • Cantilever sign
  • Bridge
  • Roadway
  • Pond
Services Provided:

Construction Services