SR 8 (I-10) at SR 95 (US 29) Phase 1 Improvements

The SR 8 (I-10) at SR 95 (US 29) intersection needed improvements, which included widening, using a phased approach to improve traffic flow, and safety for the traveling public.

DRMP provided CEI services for the $11.7 million SR 8 (I-10) at SR 95 (US 29) Phase 1 Improvements project in Escambia County, Fla. Project features included: road and bridge widening; new roadway construction; drainage improvements; pond construction; and the installation of a new traffic signal, high mast lighting, and cantilever sign installation.

DRMP’s knowledgeable CEI team provided services that allowed the client to enhance traffic flow and safety throughout the intersection as part of the first phase of improvements.

Key Facts

Location:

Florida

Client:

FDOT, District 3

Size:

0.8-miles

Highlights:
  • New roadway construction
  • Road and bridge widening
  • Drainage improvements
  • Lighting and signal installation
  • Resurfacing
Services Provided:

Construction Services