Statesville I-40/I-77 Design Build

NCDOT Division 12 needed to widen I-77 from a 4-lane to an 8-lane facility to improve traffic flow and update the previously antiquated interchange configuration.

DRMP provided CEI services for the second phase of the $260.3 million I-40/I-77 Interchange Improvement Project in Statesville, N.C. The CEI team was responsible for monitoring daily operations to document compliance with project plans and specifications. The design-build project will continue the interstate widening on I-77 from a 4-lane to an 8-lane facility that will include 14 new structures. Along with compliance monitoring, the team provided concrete paving, asphalt paving, soil-cement stabilization, erosion control inspection, surveying grade verification, and materials sampling and testing.

The CEI services provided by DRMP allowed the client to feel confident that all plans were followed precisely as the project team worked to widen the roadway to improve traffic congestion and enhance safety for the interchange.

Key Facts

Location:

North Carolina

Client:

NCDOT, Division 12

Size:

N/A

Highlights:
  • Construction of a diverging diamond interchange (DDI)
  • 10 bridge sites
  • 806, 500-cubic-yards of unclassified excavation
  • 32,020-linear-feet of storm drainage
  • 447 drainage structures
  • 188,900-tons of asphalt
  • 89,785-square-yards of concrete paving
Services Provided:

Construction Services