I-75 Concrete Rehab

A section of roadway on I-75 from north of Broadway Ave to south of Fowler Ave needed rehabilitating in order to improve the quality of the current concrete.

DRMP provided surveying services for concrete rehabilitation improvements for this project. Terrestrial Mobile LiDAR was used to collect roadway features, as well as detailed pavement data, including concrete slab joints and major cracks. DRMP also provided LiDAR data to minimize design staff site visits to analyze the slabs. High-resolution photos were obtained with the LiDAR data to provide the client with georeferenced imagery that was tied to the survey data.

Due to DRMP’s expertise and data/imagery provided, the roadway and driver experience will be improved once the rehabilitation is completed.

Key Facts

Location:

Florida

Client:

FDOT, District 7

Size:

Varies

Highlights:
  • Detailed pavement data
  • Georeferenced imagery
  • Terrestrial mobile LiDAR
Services Provided:

Surveying & Mapping/Geospatial

Terrestrial Mobile LiDAR