- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- News
- #DRMPerspective
- Team With Us
- Locations
« Back
DRMP-Designed London Waterway Project in Palm Coast, Fla., Wins FSA Award
June 16th, 2025
FORT MYERS, Fla. – DRMP’s design of the London Waterway Stormwater Expansion project for the City of Palm Coast earned an Outstanding Achievement Award from the Florida Stormwater Association (FSA).
DRMP accepted the award on behalf of the City during FSA’s annual conference, held June 11–13 at the Sanibel Harbour Marriott.
“We appreciate the recognition of this project from the Florida Stormwater Association,” DRMP Vice President Scott Garth, PE, LEED AP ND, said. “This project was a true partnership with the City of Palm Coast, and it’s rewarding to see the results making a difference for the community and the local environment.”
The City of Palm Coast tasked DRMP with designing a multi-purpose flood storage lake on 19.5 acres of city-owned property along the London Waterway canal in the northern part of the city, an area that has experienced chronic street and yard flooding, including a major event on Bird of Paradise Drive in September 2014.
DRMP's Construction Services team played a key role in the successful delivery of this project, working in coordination with the contractor, City of Palm Coast, and St. Johns River Water Management District representatives to ensure quality and timely completion. The inspection staff worked extensively to administer the contract, design documents, and specifications. Completed in January 2025, the London Waterway project addresses flooding issues while providing long-term environmental and community benefits. Located in the Matanzas Woods neighborhood, the project improves both flood protection and water quality.
Instead of a traditional retention pond, DRMP designed a 13-acre lake with curving shorelines, two half-acre islands planted with trees to support wildlife, scenic boardwalks, short trails, and native vegetation that promotes habitat creation and controls shoreline erosion. The design takes advantage of the hydraulic head stepdown across the existing LO-1 canal structure to manage water levels efficiently – allowing the lake to remain stable under normal conditions while storing floodwaters during peak events. The result provides flood relief to a broad section of northern Palm Coast.
Community feedback shaped the project’s final form. After reviewing two design options – one with limited access and one with more amenities – concerns about parking and loitering led to a more passive park design.
The project required permitting and coordination with the St. Johns River Water Management District, Florida Fish and Wildlife Conservation Commission, U.S. Army Corps of Engineers, and the Florida Department of Environmental Protection.
“This project is a testament to the power of collaboration, smart planning, and a commitment to building a more resilient community,” said City of Palm Coast Stormwater Project Manager Andrea Mudryk. “This effort will provide benefits to the residents of Palm Coast for generations to come.”
About DRMP
DRMP is a multi-discipline firm serving clients in the public, private and industrial sectors in the development of infrastructure and has been in business since 1977. DRMP currently employs 700 professionals in 23 office locations spread strategically across our service area. Today, DRMP is ranked among Engineering News-Record’s “Top 500 Design Firms” in the United States. For more information, please visit www.drmp.com.
In Other News
Aug11DRMP’s Alia Awwad, PE, to Share Vision Zero Strategies and Resilience Insights at ITE Conference ORLANDO, Fla. – As ro...See Details
Aug8DRMP Relocates Fort Myers, Fla., Office to New Downtown Address FORT MYERS, Fla. – As...See Details
Aug7DRMP Promotes Gabrielle Davis, Elevating Communications Leadership ORLANDO, Fla. – DRMP ...See Details
Aug5DRMP’s Graham and Poole Graduate FELI 2025, Advance STEM Initiatives and Leadership Across Florida PENSACOLA, Fla. – Con...See Details
Recent Articles
- 08/11/25DRMP’s Alia Awwad, PE, to Share Vision Zero Strategies and Resilience Insights at ITE Conference
- 08/8/25DRMP Relocates Fort Myers, Fla., Office to New Downtown Address
- 08/7/25DRMP Promotes Gabrielle Davis, Elevating Communications Leadership
- 08/5/25DRMP’s Graham and Poole Graduate FELI 2025, Advance STEM Initiatives and Leadership Across Florida
- 08/5/25Wekiva Parkway Section 8 Project Earns FTBA Best in Construction Award for Design-Build Excellence
- 08/4/25DRMP’s CEI Expertise Supports FTBA Award-Winning I-75 at Big Bend Road Interchange Project
- 08/1/25Kayla Poulos, PE, Graduates from 2025 ACEC/NC Future Leaders Program
- 07/31/25DRMP’s Brittany Groome Appointed to ACEC/NC Junior Board of Directors
- 07/30/25DRMP Expands PDES Team with Strategic Hires to Strengthen Transportation Planning Expertise
- 07/28/25Historic Dunedin Golf Course, Originally Designed by Donald Ross, Wins 2025 National Renovation Award
Archive
Events Calendar
DRMP eWIRE
Our bi-monthly digital newsletter offering the latest company news.