- Discover
-
Expertise
-
Alternative Delivery
- I-275 at I-4 Downtown Tampa Interchange Design-Build
- Wekiva Parkway Section 8 Interchange
- US 17/92 Interchange at SR 436
- SR 9B Extension from I-95 to US 1
- A. Max Brewer Bridge Replacement
- I-95 Widening from the Indian River/Brevard County Line to Malabar Road
- SR 528 (Beachline Expressway) at Innovation Way Interchange
- SR 570 Polk Parkway Widening from I-4 to Pace Road
- I-95 Express Lanes and Ramp Signals – Phase 3A-1
- Pollard Road Extension over Peace Creek
- I-485 Widening from I-77 to Rea Road
- Monroe Bypass/Connector Design-Build
- Construction Services
- Ecological Services
-
Federal Services
- Range of the Future Study
- US Coast Guard Air Station (Clearwater)
- Ascension Island Fire Station Renovation
- Patrick Space Force Base Water Lines Repair
- Patrick Space Force Base Living Shoreline Restoration
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Naval Station at Guantanamo Bay Survey Services
- Repair Phillips Parkway and Speed Limit Study
- Ascension Island Auxiliary Airfield Surveying and Mapping Services
-
Geographic Information Systems (GIS)
- Thermal Design/Comprehensive Campus LiDAR Collection
- Greater Orlando Aviation Authority (GOAA) Strategic Commerical Land Development Program
- University of Florida Sanitary Sewer GIS Mapping
- Ascension Island Auxiliary Airfield GIS Integration
- Santa Rosa County School District's School Transportation & Capacity GIS Analysis
- Gainesville Community Redevelopment Agency Socioeconomic Analysis and Site Suitability Report
- Real Estate Site Suitability and Development Analysis
- SR 836 (Dolphin Expressway) GIS Asset Inventory of Pre-Post Construction
- Alachua County Public Schools GIS and School Planning Professional Services
- Patrick Space Force Base Living Shoreline Restoration GIS Analysis
- Florida Army National Guard Readiness Center GIS Inventory & Integration
- Comprehensive Transit Study Puerto Rico GIS Analysis
- Land Development
- Structural Engineering
-
Subsurface Utility Engineering (SUE)
- Thermal Design/Comprehensive Campus LiDAR Collection
- P-505 Electrical Hardening and Black Start CHP at Marine Corps Air Station Beaufort
- Resurface & Safety Improvements Turnpike Mainline
- University of Florida Rabon Utility Mapping
- FP&L Subsurface Utility Engineering Continuing On-Call Contract
- Lockheed Martin Subsurface Utility Engineering Services
- Palm Coast Parkway Subsurface Utility Engineering Services
- Surveying & Mapping/Geospatial
-
Traffic Impact Analysis
- 505 West Chapel Hill Street
- 5th Street Station
- Beale Farm Industrial Park
- Blue Mountain Mist Resort
- The Villages at McCullers Walk
- Fredericksburg National Baseball Stadium
- Hendrick Southpoint Auto Mall
- Apex Friendship Elementary School
- Whole Foods Center
- Barclay West
- Grove 98
- Pullen Drive Extension/Catholic Diocese
- Trails/Parks & Recreation Facilities
- Transportation
-
Utilities Engineering
- Ascension Island Fire Station Renovation
- M-1 Canal Water Main Extension
- 5th Street Bridge Utility Replacement
- Captain’s Cove Wastewater Plant Revisions & Permit Renewal
- City of Fort Myers Downtown Utility & Streetscape Improvement
- Florida Caverns State Park Lift Station Rehab
- Tween Waters Inn Wastewater Plant Permit Renewal
- City of Fort Myers Wastewater Capacity Studies
- Patrick Space Force Base Water Lines Repair
- Big Lagoon Boat Ramp Wastewater System
- St. Joseph State Park Septic Tank Replacement
- WildBlue Development Wastewater Modeling
- A-1 Gator Wastewater Capacity Increase
- Water Resources/Stormwater Management
-
Alternative Delivery
- Careers
- Insights
- Connect
- Powered By Trilon
Page 1 of 4
Now viewing articles posted in 2026.

LAUNCH Gives DRMP Interns Head Start on Their Careers
September 3rd, 2026
For engineering students preparing to enter the AEC industry, an internship is often their first opportunity to apply what they’ve learned in the classroom to real projects. It can also help them begin to determine where they want to take their careers.But even with that experience, there can be a...4 minute read
DRMP Showcases Innovative School Planning Solution at the 2026 ESRI Education Summit
August 6th, 2026
Situated in the Tampa, Fla., region, Hillsborough County Public Schools (HCPS) serves more than 220,000 students across one of the fastest-growing areas in the state. As the seventh largest school district in the country, HCPS experiences the ongoing challenge of balancing current student needs with...3 minute readPosted in: All, Geographic Information Systems
The Engineering Behind Downtown Orlando’s Magnolia Avenue Two-Way Conversion
August 3rd, 2026
The Magnolia Avenue Phase 1 Improvements restore two-way traffic along a key downtown Orlando corridor, creating a more connected, accessible, and multimodal street network within the Historic Business District. As the roadway design engineer, DRMP developed innovative solutions that enhance safety, improve access for motorists, pedestrians, cyclists, and transit users, and support the City of Orlando's long-term vision for a vibrant and economically resilient downtown.
2 minute readPosted in: All, Civil Services
Behind the Drawings: A CAD Designer’s 30-Year Career in Bridge Design
August 2nd, 2026
In recognition of National CAD Day, DRMP Structures Chief Designer Jim Arnemann reflects on more than 30 years in the industry, sharing how computer-aided design has transformed structural engineering from hand-drafted plans to advanced digital workflows. Through his career, including work on the award-winning A. Max Brewer Bridge, Jim offers insights into the evolution of CAD technology, the importance of collaboration and attention to detail, and why experienced professionals remain essential to delivering safe, high-quality infrastructure.
3 minute readPosted in: All, Structural Engineering
A Major Central Florida Traffic Headache Gets a Long-Term Fix at I-4 and Sand Lake Road
July 28th, 2026
The I-4 at Sand Lake Road Interchange is transforming one of Central Florida's busiest and most congested interchanges into a modern diverging diamond interchange (DDI), improving safety, mobility, and access to the International Drive Tourism District. Delivered through a collaborative design-build approach, this complex project showcases DRMP's expertise in innovative transportation design, stakeholder coordination, and cost-effective engineering solutions that enhance traffic operations, improve regional connectivity, and support one of Florida's most heavily traveled transportation corridors.
2 minute readPosted in: All, Alternative Delivery
DRMP Gives Families a Lift Through Its Charity Bike Build 2026
July 23rd, 2026
DRMP employees took time out of their day to volunteer at the firm's Orlando, Fla., headquarters for the Charity Bike Build, assembling 50 bicycles for children and teens served by the Howard Phillips Center for Children and Families. Through the DRMPCares program, the event reflects the firm's commitment to supporting community involvement initiatives that create lasting, positive impacts in STEM education, health, and the lives of children.
3 minute read
Wekiva Parkway Section 8 Interchange Closes Gap, Improves Regional Travel
July 21st, 2026
The Wekiva Parkway Section 8 Interchange completed the final connection of Central Florida’s beltway, addressing a critical transportation gap while improving regional mobility, enhancing safety, and strengthening connectivity between I-4, SR 417, and SR 429. This multiple award-winning design-build project highlights DRMP’s expertise in innovative engineering, collaborative design-build delivery, and cost-effective solutions that overcame complex corridor challenges, reduced project risks, and delivered a more reliable route for thousands of motorists traveling through the region.
2 minute readPosted in: All, Alternative Delivery
Surveying One of Golf’s Most Legendary Holes
July 14th, 2026
DRMP provided survey services for the replacement of the deteriorating bulkhead surrounding one of professional golf's most iconic putting greens. Using advanced geospatial technology and precise field coordination, our team delivered the accurate survey data needed to preserve the landmark's original design while enabling successful construction.
2 minute readPosted in: All, Surveying & Mapping
Port St. Lucie Intersection Upgrade Improves Safety at Village and Tradition Parkways
July 7th, 2026
DRMP delivered a comprehensive redesign of one of Port St. Lucie’s busiest intersections, transforming a high-crash, congestion-prone corridor into the city’s first protected bike intersection while improving traffic operations for all users. Through multidisciplinary collaboration, innovative engineering, and safety-focused design, DRMP developed a cost-effective solution that enhances mobility, reduces conflict points, and creates a safer, more connected intersection for drivers, pedestrians, cyclists, and transit riders.
3 minute readPosted in: All, Transportation
What Does Safety Look Like at DRMP Through a Safety Leader’s Eyes?
June 25th, 2026
Creating a safe workplace requires attention to the conditions, behaviors, and processes in daily operations. DRMP Environmental Health and Safety Manager David Couch works with employees at the firm to strengthen safety awareness, support compliance, and promote a culture that takes safety seriously. In recognition of National Safety Month, this Q&A explores Couch’s approach to safety leadership, industry challenges, and the importance of ensuring every employee returns home safely each day.
7 minute readPosted in: All
Categories
- All
- Alternative Delivery
- Civil Services
- Construction Services
- Disaster Resilience and Sustainability
- DRMPCares
- Ecological Services
- Electrical Engineering
- eWIRE
- Federal Services
- Geographic Information Systems
- Hurricane
- Land Development
- Learning & Development
- NEPA
- Project Development & Environment
- Structural Engineering
- Subsurface Utility Engineering
- Surveying & Mapping
- Traffic Impact Analysis
- Transportation
- Transportation Planning/Project Development
- Utilities Engineering
- Water Resources/Stormwater Management
Contributors
- Michael K. Albano, PE
- Jim Arnemann
- Bruno J. Arriola, PE, ENV SP
- Alia Awwad, PE
- Brent Bass, PE, PSM
- Cody Bayer, PE
- Maria Bazemore, PWS, AICP
- Paul Benvie, PE
- Donald W. Brown, PE
- Kyle Brown, PE
- Jake Burton
- Zach J. Carnahan, PE
- David Couch
- Brian Crowl, PE
- Patrick Day, PE
- Nick DeVito, PE
- Joe Di Benedetto, PLS, LS
- Scott Garth, PE, LEED AP ND
- Ryan M. Grab, CST II
- Robyn Hartz, INCE
- Justin Hayes, EI
- Lucas S. Helms, PE
- Jim Highland, PE
- Ryan Ianacone, CST II
- Erica Jernigan, PE
- Ravneet Kathuria
- TJ Lallathin, Jr., PE, DBIA
- Jay McInnis, PE, CPM
- George McLatchey, PWS, CEP
- Ryan Mitchell, PE
- Megan E. Mott, PE
- Josh Norman
- Melissa Padilla Cintron, SIT
- Pavan Paiavula, PE
- Ryan Pellarin, PE, CCM
- AJ Perkinson, PLS
- Julian Poole, PE
- Kayla Poulos, PE
- Kim Sadowski, PE, RSP1
- John Schick, PTP
- Rachel L. Schmidt, PWS
- Logan Shappell
- Rynal Stephenson, PE
- Albert Taylor
- Deston Taylor, PE, PTOE
- Keelyn Taylor, PhD
- August Thick II, PLS
- Thomas Tracz, PSM
- Grady Vaughan, PE, PTOE, PTP
- Orville Williams
- Amanda E. Woods, PE
Page 1 of 4




